Client Requirements
When a busy manufacturing facility started to feel the strain of an outdated site layout, it was more than just an inconvenience — it was slowing down production. The client needed a full infrastructure upgrade, including access improvements and new yard surfacing. With machinery running 24/7, the project had to be carefully managed to avoid downtime.
From the start, we worked closely with the client to understand their shift patterns, site usage, and safety procedures. Every element of the project was planned around live operations — including drainage upgrades, improved logistics routes, and yard concreting in Birmingham for high-traffic areas.
To keep the facility fully functional, the work was delivered in tightly phased sections. Our in-house team managed everything — from breaking out old concrete to pouring and finishing — giving the client peace of mind on quality, timing, and safety. Regular communication with the on-site team meant we could adapt quickly and keep things moving, even when schedules shifted.
The outcome? A refreshed, future-ready site that now supports safer movement, improved efficiency, and better resilience — all delivered without shutting down production.
The clients experience
We needed major upgrades to our yard and access routes, but couldn’t afford to stop production. That was the biggest challenge - finding a way to modernise the site while keeping everything running. PKB's team coordinated every phase around our shifts, stayed in constant communication, and delivered high-quality yard concreting here without disrupting our operations. The result has transformed how we move on site. Really impressed with the professionalism from start to finish.