Construction Line Gold Contractor
Comprehensive Site Surveys
Keeping Clients Operational
Operate UK Wide
Construction Line Gold Contractor
Comprehensive Site Surveys
Keeping Clients Operational
Operate UK Wide
Turning Unused Land Into a Fully Operational Manufacturing Yard
Many industrial sites have unused land that never gets acted on. For this Bolton manufacturer, the concrete hardstanding construction behind their warehouse became an opportunity to expand their operation without moving premises. PKB Civils were brought in to turn that unused ground into a fully operational yard across an eight-week programme.
We cleared the site and laid approximately 1,250m² of concrete hardstanding, brush finished with bullnosed edges and built to handle the demands of a working manufacturing environment. The concrete hardstanding construction included new ACO drainage channels and a separator tank to ensure surface water leaves the site safely and in compliance with environmental requirements. A retaining wall was constructed to secure the boundary, and the space was completed with lighting towers and racking to make it fully operational from day one.
The result is a purpose-built yard that gave the client significant new operational capacity without the disruption or cost of relocating. The full scope was delivered by PKB Civils on a single programme, leaving the site ready to use the moment it was handed over.
What we do in 60 seconds
- Full concrete yard construction and resurfacing
- Repairs and upgrades on live, operational sites
- In-house delivery from survey through to completion
The clients experience
Thanks so much to the team, great work as always. The yard is already making a difference to how we move around site.





