Construction Line Gold Contractor
Free Site Surveys
Keeping Clients Operational
Operate UK Wide
Construction Line Gold Contractor
Free Site Surveys
Keeping Clients Operational
Operate UK Wide
Client Requirements
When a long-standing client in Stockport needed to redevelop their busy yard, the brief was clear: improve operational efficiency, enhance safety, and future-proof the space — all while keeping the site live. With the yard in daily use, any downtime would have impacted productivity and service delivery.
Over a 12-month programme, we upgraded critical infrastructure across the site. This included new drainage systems, improved traffic routes, and reinforced yard concreting in Stockport to withstand heavy daily use. Each phase was planned around the client’s operations, ensuring that access was maintained and disruption was kept to a minimum.
Safety was a top priority. As the site remained active throughout, our team worked closely with the client’s health and safety leads to manage risks, control movements, and keep both staff and visitors protected at all times.
By handling every stage in-house — from design and planning to final pour — we maintained full control of the timeline and quality standards, giving the client confidence at every turn.
The result? A completely revitalised yard that now supports smoother vehicle flow, increased safety, and the business’s growing operational demands — all delivered with zero downtime.
The clients experience
The new layout, drainage, and concreting have transformed how we operate. It's made the site safer, smoother, and ready for future operations. We’re really pleased with the outcome.