PKB Civils is a specialist civil engineering contractor for distribution sheds, factories and trade yards in Leicester and across Leicestershire's part of the logistics Golden Triangle. Our own crews and plant travel from Rochdale, we plan round the separate city and county permit rules, and the work is phased so your site keeps running.
Leicestershire's distribution sheds, factories and trade yards can't stop because a yard has failed or a drain has collapsed, so we build round them. Our crews break out old concrete, dig, lay drainage and pour new slabs with plant we own, and one team takes the job from the first survey to handover.
Our crews and plant come from Rochdale, 80 miles away in a straight line, and the nearest districts on our delivered list are CV11 and DE12. A Leicester job is planned at the free site survey: the phasing, the plant and the programme, set around how your site works.
2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986
What we do across Leicester and Leicestershire
Concrete yards for the distribution estates around the city, from Magna Park to Enderby and Hinckley, with each mix chosen after the ground has been tested for sulphate. Drainage for yards in a city whose brooks rise within hours of heavy rain, designed to the runoff cut the city council expects of brownfield schemes. Groundworks on stiff till that softens once it's opened, and on mudstone that carries gypsum. Earthworks that keep dug mudstone fit to reuse and test old pit fill before any of it is tipped. Enabling works for the employment plots in Leicester's Local Plan and the next phases at Magna Park. The detail for each sits on its own Leicester page.
Groundworks
Bases, trenches and walls on Leicester's till, Soar gravels and gypsum-bearing mudstone, with the ground proved before it's dug.
Leicester is a long run from Rochdale, so our crews work away from home when a job needs it, and the gang that starts your yard is the gang that finishes it. Plant, materials and the order of work are fixed after the survey, so nobody is waiting on a delivery once the crew arrives.
Phased round your loading doors
Ben's point is that emergency repairs land at the worst moment, while planned work can be fitted round deliveries and done in stages. On a Leicestershire distribution yard that means closing one section at a time and handing it back before the next. Distance hasn't stopped us working that way before: a large yard in Glasgow stayed in use while we renewed its concrete and drainage.
Formwork, steel and pour by our own people
Ben's advice to anyone choosing a contractor: “If a contractor is vague about how formwork will be set up or is outsourcing it to a separate trade, that is worth questioning before work starts.” Our own crews set the formwork, fix the steel and pour the concrete, and we deliver around 90% of our work with our own people and plant.
Got a Leicester site that needs work?
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.
Five things that decide how a Leicester job is planned, each covered in full on its own page.
Gypsum under the centre
The British Geological Survey maps gypsum-rich mudstone under central Leicester and the Soar and Wreake valleys, and warns that its slow dissolution could cause uneven settlement under heavy structures. See groundworks in Leicester.
Sulphate and buried concrete
The same gypsum, and sulphur minerals in the Lias east of the city, can attack buried concrete, so the mix waits for the ground tests: concrete yards in Leicester.
Brooks that rise in hours
The city's urban brooks react to rain within hours and a second, larger peak follows as water arrives from the rural headwaters, the 2022 flood risk assessment explains. That matters wherever a yard drains to one: drainage in Leicester.
Old pits on the floodplain
Restored gravel pits on the Soar and Wreake floodplains may be backfilled with demolition waste, refuse or industrial waste, which decides where spoil can go: earthworks in Leicester.
Plots still to be prepared
The Local Plan's employment sites, from Beaumont Park to the former Western Park Golf Course, and the extra warehousing proposed at Magna Park all need preparing before anything is built: enabling works in Leicester.
Feedback from the people who run these sites, shown with the job we did for them.
1 / 3
“
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job
“
Thanks guys, really happy with how this came out. The yard is great, staff can move around and we've got our space back. Will definitely be coming back to you again.
New concrete yardLondon, Builders merchants, 4 weeksSee the job
“
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Yard extension and retaining wallBolton, Builders merchantsSee the job
Where is Leicester's industrial land, and why is so much of it outside the city?
Leicester sits inside the logistics Golden Triangle, which Harborough District Council bounds by the M1, M6 and M69, though others draw it wider. The council places the area's strategic warehousing in three clusters: along the M1 corridor, around the East Midlands Gateway rail freight interchange and at Magna Park in Harborough district. The last two are outside the city boundary altogether.
The city itself is tightly drawn. The Inspectors' February 2026 report on the Leicester Local Plan puts the need for industrial and small-scale storage and distribution land at 65 ha, more than the city can find within its own boundary, and 23 ha of it is to be met in Charnwood Borough instead. For a business that has outgrown its site, that makes a bigger yard on land it already holds worth costing before a move. It also means a Leicester job can cross a council line: a shed in Blaby or Harborough deals with the county for its roads and surface water, a site in the city with the city council.
Will our HGVs pay a clean air charge to reach a Leicester site?
No. Leicester has no Clean Air Zone: the GOV.UK list of charging zones names Bath, Birmingham, Bradford, Bristol, Portsmouth, Sheffield and Tyneside, and Leicester isn't among them. In May 2025 the city council reported that Leicester had met every national air quality objective for nitrogen dioxide, PM10 and PM2.5 for the third year running, so our lorries and your suppliers' reach a city site without a daily fee.
Do we need a council permit to open the road outside a site in the city?
Yes, if any of the work is in the road. Leicester City Council requires a permit for any roadworks or street works in Leicester, applied for on GOV.UK, and deals with Section 50 private works, scaffolding, hoardings and skips separately. Work that stays inside your boundary needs none. The permit is in hand before our crew breaks the surface of the highway.
Which authority handles road works at a site out by the M1 or the M69?
It depends on the road. Outside the city, Leicestershire County Council runs its own highway permit scheme, and anyone working on its roads needs a permit before starting unless they hold a Section 50 licence. The county isn't the highway authority for motorways or some major A-roads, which are National Highways' responsibility, so a new entrance onto one of those is a different application with a different body.
How would you run a Leicester job from Rochdale?
As one planned run of work. The survey comes first and is free; then the phases, plant and materials are agreed with your site team before anyone travels. Our crews and plant come from Rochdale, and the crew works away from home where the job calls for it, so the same people are on your site from the first day to handover. Survey dates for LE postcodes are agreed when you send the brief.
Which of your delivered districts are closest to Leicester?
CV11 and DE12 are the nearest districts on our delivered list, and we have more than 2,000 projects completed across the UK behind us. A Leicester client gets the way we already work on sites that have to stay open: our own crews and plant from Rochdale, and one team from survey to handover.
Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.
We use cookies to see how people use our site and to measure our adverts. They're on unless you choose Reject all. Privacy policy
Necessary
Needed for the site to work, such as remembering your cookie choice. They don't store anything that identifies you.
Always active
Analytics
Google Analytics and Microsoft Clarity show us how people use the site, such as which pages they visit and where they came from, so we can improve it.
Advertising
HubSpot, Google Ads and WhatConverts cookies measure how our adverts perform and connect an enquiry or phone call to the advert or page that led to it.