PKB Civils is a specialist civil engineering contractor for manufacturers, logistics operators and their suppliers in Coventry and on the employment land around it, from Whitley to Ansty and Ryton. Our own crews bring their plant from Rochdale and sequence the work around your shifts and deliveries, after a free survey that looks at how the site runs.
This page is for the people who run Coventry's factories, sheds and supplier yards: site managers with a yard that is breaking up, flooding at the doors or too small for the traffic it now takes. We are the contractor that does the building. Our crews saw, break out, dig, lay drains and pour concrete with our own plant, and Ryan, who surveys your site, prices the job those same crews will build.
Coventry adds an early question of its own. A lot of the city's industrial land lies over the boundary in Rugby Borough or Warwick District, so the planning rules that apply may not be Coventry's. We settle that at the free survey, along with the ground, the drainage and how your site has to keep moving while we work.
2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986
What we do across Coventry
Concrete yards are the core of it: new hardstanding, failed bays cut out and relaid, and the aprons where lorries stand at the doors. Drainage tends to come with them, because new hardstanding in the city often has to store its rainwater before it leaves the site. Groundworks covers the bases, trenches and walls dug into Coventry's clay. Earthworks deals with what comes out of the ground and the levels a plot needs, and enabling works gets plots ready on land such as GreenPower Park, the former airport. Each service has its own Coventry page.
Groundworks
Bases, trenches and walls in Coventry's clay, planned for running sand, valley groundwater and the canals to the north.
Coventry is 88 miles in a straight line from our Rochdale yard, and distance isn't new to us: we relaid a merchant's yard in Enfield, further away still, while it kept trading. A job this far out is planned before the crew sets off, so the people, plant and materials arrive on the day agreed.
A planned programme costs less
In Ben's words, “The point is not that reactive maintenance should never happen. It is that when it becomes the default approach to yard maintenance, the cumulative cost and operational impact is consistently higher than a planned alternative would have been.” On a Coventry production site, planning also lets the work land in the weeks that suit you.
One contractor for the whole site
Our own people and machines carry out around 90% of what we deliver, and we bring in specialist trades such as racking and lighting towers under our management as principal contractor. A Coventry site that needs a yard, drains and a new entrance deals with one firm.
Got a Coventry site that needs work?
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.
Local conditions that change a job before it starts, each covered in full on its own Coventry page.
Storage under new hardstanding
Where a new yard can't drain into the ground, the council restricts its runoff to the greenfield rate minus 20%, or 5 l/s if that is greater, so the drainage often needs storage beneath the slab. See drainage in Coventry.
GreenPower Park's new supply is coming by cable from the Coventry Central Bulk Supply Point, with the first power due in 2027, the council says. Enabling works in Coventry covers the site.
Yards built for production
Draft policy for GreenPower Park would cap storage and distribution at 40% of the floorspace, according to the council's Cabinet report, so its yards are likely to serve manufacturing. See concrete yards in Coventry.
Feedback from the people who run these sites, shown with the job we did for them.
1 / 3
“
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job
“
Everything was prepared when we arrived and the school was kept running throughout. Really pleased with how it went and look forward to working with you again
Modular classroom groundworksSt Helens, Modular, 4 weeksSee the job
“
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Yard extension and retaining wallBolton, Builders merchantsSee the job
Why is so much of Coventry's industry outside the city boundary?
Because the city ran short of room. Coventry's Local Plan puts its need for employment land from 2011 to 2031 at 369 ha, including replacements for sites lost, and allocates 107 ha inside the city, accepting that it can't meet the full requirement within its own boundaries. Ansty and Prologis Ryton, just over the line in Rugby Borough, are counted towards Coventry's supply because they sit next to the city, and Warwick District has allocated land around Coventry Airport too. On those estates the planning authority is Rugby or Warwick District.
The roads east of the city are changing as well. National Highways won development consent in February 2026 for a fully grade-separated junction on the A46 between Walsgrave and M6 junction 2, just north of the existing Walsgrave junction, with construction expected from autumn 2026 and the junction open to traffic in 2028. Inside the city, anyone intending to work on the highway, whether for a new access or a drain connection in the carriageway, must first apply to the council for a permit, which it can refuse or grant with conditions on how and when the work is done.
A local track record
Postcode districts in Coventry and Warwickshire where we've delivered: CV11.
If the whole of Coventry is an Air Quality Management Area, do lorries pay to enter?
No. The council declared the whole city an Air Quality Management Area, instead of single roads or junctions, so that the problem isn't simply moved from one road to another, its 2024 status report explains. That brings no charge. In February 2020 the government confirmed Coventry didn't need a charging Clean Air Zone, and the council's action plan works through road and junction changes instead.
Will the air quality changes on Holyhead Road or Foleshill Road affect deliveries to our site?
They may change the route. The council's action plan tackles nitrogen dioxide on Holyhead Road through changes to junctions and road layouts, and on Foleshill Road by encouraging through traffic to use the A444. Its 2024 report also names parts of Walsgrave Road among the current hotspots. None of it carries a charge, but a delivery plan for a site on those roads should check the layout first.
Have you worked in or near Coventry before?
In the CV postcode area our delivered work so far is in the CV11 district, and we don't yet have a Coventry case study on this site. The rest of a Coventry job is how we work everywhere: our own crews and plant travelling from Rochdale, a free survey before anything is priced, and the work sequenced around how your site runs.
Is a small yard repair in Coventry worth your while from Rochdale?
Yes, and a survey of the whole yard makes the visit count. Ben's approach is to build a clear picture of a yard's condition, see which faults are developing and deal with them in a planned order before they stop the site. For a site this far from our yard, that often means grouping several repairs into one programme, which keeps travel down and gives you one set of dates to plan round.
Who sorts out the materials and paperwork for a Coventry job?
Laura, our operations support manager, orders the materials and prepares the RAMS before work starts, so everything is in place when the crew arrives. Tom, our project manager, runs the site team and keeps you told about start dates and progress, and Paul, one of our directors, leads the work on site through to handover. You have their names from the start.
Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.
We use cookies to see how people use our site and to measure our adverts. They're on unless you choose Reject all. Privacy policy
Necessary
Needed for the site to work, such as remembering your cookie choice. They don't store anything that identifies you.
Always active
Analytics
Google Analytics and Microsoft Clarity show us how people use the site, such as which pages they visit and where they came from, so we can improve it.
Advertising
HubSpot, Google Ads and WhatConverts cookies measure how our adverts perform and connect an enquiry or phone call to the advert or page that led to it.