PKB Civils gets commercial and industrial plots in and around Coventry ready for the main build, from GreenPower Park at the former airport to the Investment Zone land at Whitley. As a specialist enabling works contractor, we clear sites and break out old slabs and bases with our own crews and plant travelling from Rochdale.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Enabling works for Coventry's commercial and industrial sites

Send your brief

Enabling works is everything between a plot being secured and the main contractor arriving: clearance, old slabs and bases broken out, redundant drains and ducts dealt with, hoarding, a compound and a way in. On Coventry plots we do that with our own crews and machines, and hand over ground the next trade can start on.

Much of the area's development pipeline, and so much of the clearance to come, is on the Coventry and Warwick Investment Zone, which straddles the city and Warwick District and is aimed at advanced manufacturing, future mobility and vehicle electrification. Our enabling works service describes each part of the work.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Enabling works in Coventry: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Clearing the plot

    Fencing, vegetation, kerbs and anything else redundant taken off the land, leaving a clean plot the surveyor can set out on.

    Send your brief
  • Old foundations out

    Former floor slabs, plinths and bases breakered and lifted, so nothing is left in the ground to stop a piling rig or a new drainage run.

    Send your brief
  • Services dealt with first

    Disused drains sealed off and live cables or pipes disconnected or moved, once trial holes have shown where they really run.

    Send your brief
  • Access roads and compounds

    Temporary roads, a compound and a construction entrance laid out early, so the main contractor's deliveries have somewhere to go from day one.

    Send your brief
  • Hoarding and traffic management

    Secure hoarding between the works and the rest of the site, with planned routes keeping vehicles and people apart.

    Send your brief

Why Coventry sites choose us for enabling works

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Working with you in real time

    Ben puts our strength down to our own people and delivering direct, which lets us work with a client as things happen. On a Coventry plot whose start hangs on a planning decision or a power date, a change of plan is agreed with us directly.

  • Timed to the next contractor

    Clearance is sequenced back from the main contractor's start date, so the plot is cleared, levelled and fenced when they need it, and is not left standing open for months beforehand.

  • Access sorted first

    Hoarding, the compound and the way in are set out before the breakers start, and where the entrance meets a Coventry road, the council's permit is in place before anyone works in the highway.

Getting a Coventry site ready to build?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

Before clearance starts on a Coventry plot

The questions that most often set the start date for enabling works around the city.

  • A planning route still being settled

    The council planned a new hybrid application for GreenPower Park in October 2026, aligned with the draft plan to release the site from the Green Belt, with approval expected by May or June 2027 and first buildings possible in 2028 if occupiers commit, according to its Cabinet report.

  • Old ground under an old floor

    On land with an industrial or landfill past, the council's planning checklist asks for a contamination desk study first, gas included, which can change what is broken out and where it goes. It's set out on earthworks in Coventry.

  • A brook under the plot

    Coventry's Local Plan expects development to stand back from watercourses, culverted ones included, which can move a building line: see drainage in Coventry.

  • A busy neighbour

    Whitley Business Park sits next to Jaguar Land Rover's world headquarters, the Local Plan notes, so plots there share their roads with a busy working site, and deliveries are planned around it. More on concrete yards in Coventry.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 3
Yard extension and retaining wall
Really happy with the result. Your team were great to have on site and we were trading throughout which was important. Thank you.
Yard extension and retaining wallRochdale, Builders merchants, 3 weeksSee the job

What ground and site conditions should you expect in Coventry?

Some of the land being prepared was working until recently. Runway operations at Coventry Airport ceased in June 2026, the council's September 2026 Cabinet report records, so GreenPower Park's plots are being readied on a former airfield, where old paving, fencing and buried services can be part of the clearance. Each one is found, made safe and lifted before the plot is handed on, so the main contractor doesn't meet it under a new building.

Power is the long lead. To bring the site's supply up to battery-manufacturing needs, a cable route is being laid from the Coventry Central Bulk Supply Point, the council's scrutiny briefing says, with early ducting on Humber Road and London Road from November 2025, the substation and cable due to start in April 2026 and the first supply due in 2027. A plot's programme can hang on when its power arrives, so we build that date into ours.

Under the plots, the ground ranges from clay till to river sand and gravel, which groundworks in Coventry sets out. At GreenPower Park the plots, access and drainage network already approved would carry into the planned new application, so clearance works to a layout that's already drawn, as earthworks in Coventry explains.

When enabling works isn't the right call

Clearing a plot long before its build date can mean paying twice. Where the start depends on planning or a power connection still to come, as at GreenPower Park, early clearance leaves bare ground to weather and regrowth for months. It's usually better timed to the main contractor's start, with hoarding and access in place a little ahead of the breakers.

Battery, solar and charging systems are another boundary. We don't design or install them, though we get the ground ready for the installer, and Paul's article on renewable installations explains what a yard needs before heavy static loads and crane lifts arrive.

A local track record

Postcode districts in Coventry and Warwickshire where we've delivered: CV11.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about enabling works in Coventry

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Who owns GreenPower Park, and what is it consented for?

Coventry City Council owns the freehold of Coventry Airport, a 125 hectare site in Warwick District now marketed as GreenPower Park, according to its scrutiny briefing. In January 2022 Warwick District Council gave outline approval for 530,000 m² of development there for battery manufacturing and associated uses such as battery recycling, research and development, supply chain and headquarters functions.

How much land does the Coventry and Warwick Investment Zone cover?

Nearly 250 hectares, straddling Coventry and Warwick District, across four sites: GreenPower Park, SEGRO Park Coventry, Whitley South and Whitley East, the council says. Of that, 183 hectares are available for the zone's tax incentives until the end of September 2034. The focus is advanced manufacturing, future mobility and vehicle electrification, so the plots are being prepared for production buildings.

Will you take on clearance at City Centre South?

It's a homes-led scheme: a 6.5 ha site for over 1,550 new homes, with a first phase of homes, commercial space and public open space, assembled by compulsory purchase for delivery from 2025 to 2034, the council says. Our work is external commercial and industrial sites, and when an enquiry is residential we say so plainly at the first call.

What is happening at Friargate, Coventry's business district?

One Friargate and Two Friargate are in occupation and the 100-room Hotel Indigo opened in January 2024, the council says, while the joint venture company is looking for investment to bring forward future phases of offices, homes, retail, leisure and hotels. Commercial plots in those later phases are likely to need clearing, services and access before anything is built on them.

Do you lay temporary access roads and compounds for main contractors in Coventry?

Yes. Access roads, temporary works, hoarding and traffic management are part of our enabling works, set out early so the main contractor arrives to a plot that already works. On a large plot such as those at GreenPower Park or Whitley, the route for construction traffic is planned with the plot's approved access, so the temporary road doesn't sit where a permanent one is going.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.

Call usSend your brief