Enabling works contractors in Leicester

PKB Civils is an enabling works contractor preparing commercial and industrial plots in Leicester and Leicestershire, from employment land in the city's Local Plan to older units at Magna Park. We strip the site, lift redundant slabs and bases, cap or reroute drains and services and put up hoarding and access, with our own crews and plant from Rochdale.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Enabling works for Leicester's commercial and industrial sites

Send your brief

A plot isn't ready for the main contractor until the fences, scrub, old slabs and bases are gone, the redundant drains are capped and any live service has been cut off or moved. That part is ours, done with our own crews and plant, and the plot is handed over at the level and on the date your programme needs.

In and around Leicester, the plots coming forward include employment land that the Inspectors' February 2026 report supports in the city's Local Plan, such as Beaumont Park and the former Western Park Golf Course, and the extra warehousing Harborough's submitted plan proposes at Magna Park. Demolition, temporary works and traffic management are part of our enabling works service too.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Enabling works in Leicester: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Clearing the plot

    Vegetation, old fencing, kerbs and debris cleared back to the boundary, leaving a plot the setting-out engineer can work on.

    Send your brief
  • Slabs and bases lifted

    Redundant floors, yards and machine bases broken out, with the concrete heaped on its own, away from the soil, so each can be dealt with properly.

    Send your brief
  • Services made safe

    Drains capped, live services isolated or diverted with their owners, and unknown pipes traced before a machine digs near them.

    Send your brief
  • Hoarding, access and permits

    Hoarding, gates and a site entrance set up, with any work in a city road under a Leicester City Council permit and county roads under the county's scheme.

    Send your brief
  • Handed over at level

    Levels taken and recorded at handover so the main contractor starts from known ground, with our groundworks crew able to stay on if you'd rather keep one firm.

    Send your brief

Why Leicester sites choose us for enabling works

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Planned before anyone travels

    Our pre-construction and project planning are led by Ben. On a Leicester plot that means the survey, the service records and any permits are lined up before a crew leaves Rochdale, so the first day on site is a working day.

  • Sharing a road with working sheds

    Harborough's proposed MP1 site is infill that would use Magna Park's existing access off the A4303, so clearance traffic there would share a road with sheds that are working. Our lorry movements, the hoarding line and the gate would be planned around their deliveries.

  • Old floors lifted in stages

    Where an older unit is replaced, we lift its yard and floor in planned stages and record what's under each one, so a buried tank or an old drain shows up early and changes the plan before the build is waiting on it.

Getting a Leicester site ready to build?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

Questions to answer before clearing a Leicester plot

The approvals and unknowns that set the start date for enabling works in and around Leicester.

  • A freeport plot is a county job

    Leicestershire's East Midlands Freeport tax site, EMAGIC, is around East Midlands Gateway in North West Leicestershire, designated with effect from March 2022 according to GOV.UK, so a plot there comes under the county's road permit scheme for any work in the road.

  • Waterside's Enterprise Zone

    Leicester Waterside is one of three sites in the Loughborough and Leicester Science and Innovation Enterprise Zone, confirmed by government in February 2017 and covering 160 hectares across all three.

  • A neighbour next to the plot

    One of the Local Plan's smaller allocations lies east of Samworth's Bradgate Bakery, so clearance there would be planned round the bakery next door, with the hoarding line and our lorry movements agreed before the first machine arrives.

  • What lies under the plot

    Gypsum-bearing mudstone and old pit fill both affect what follows clearance: see groundworks in Leicester and earthworks in Leicester before the formation level is agreed.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 3
Concrete repairs
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job

What ground and site conditions should you expect in Leicester?

Beaumont Park is allocated for 25,000 sqm of industrial and distribution floorspace on 6.64 ha, and the Inspectors' report notes that historic uses there may have left contamination. On a plot like that, clearance starts with knowing what's in the ground: trial pits and testing come before the slabs are lifted, so spoil and crushed concrete can be kept apart and dealt with properly.

At Magna Park the work is different. Harborough's plan encourages on-site recycling of older units as they become obsolete, and taking down an old shed leaves its floor slab, yard, bases and drains to break out, with the levels for the next building to reset.

In the city centre, the station is being turned round. Under the council's November 2026 tender, the main entrance moves from London Road to Station Street, which will close to traffic for a pedestrianised plaza, and pick-up and drop-off move to the rear off Fox Street. Access and delivery routes for sites nearby may change with it, and a clearance programme there would need to allow for that.

The ground under each of these plots, from gypsum-bearing mudstone to old pit fill, is covered on the groundworks and earthworks pages for Leicester.

When enabling works isn't the right call

A separate enabling package earns its keep on a plot with buildings, services and a boundary to sort out. Where a yard is simply being extended over ground the business already uses, folding the clearance into the concrete job is usually simpler: see concrete yards in Leicester.

And an older yard that is tired but sound may not need clearing at all. Ben's approach to maintenance starts with a clear picture of the yard's condition and deals with the issues in order, before they stop the operation. Paul's article on ageing yard infrastructure explains how a condition survey and a phased programme deal with an older yard without one big outlay.

Questions about enabling works in Leicester

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Which employment sites does the Leicester Local Plan support?

The Inspectors' February 2026 report supports, with modifications, employment land at the former Western Park Golf Course (10.75 ha), land east of Ashton Green beside the A46 Western Bypass (2.4 ha) and Beaumont Park, plus smaller allocations elsewhere in the city. Each of those plots needs clearing and preparing before the build, and some of them are open land now.

What is planned next at Magna Park?

More warehousing, if Harborough's submitted Local Plan goes ahead as proposed. Harborough District Council proposes 340,000 sqm more strategic warehousing on 137.8 ha: MP1, land south of George House on Coventry Road, and MP2, land at Mere Lane, extending Magna Park North and Central. Both would need site preparation before any shed goes up.

When will the Leicester station rebuild start?

Not before a contractor is appointed. In November 2026 Leicester City Council relaunched its tender for a contractor to redevelop the station with Network Rail and East Midlands Railway. Bids close on 14 December and the contract is expected to be awarded in summer 2027, so yard or plot work nearby can be timed with that programme in view.

Do you take on demolition as part of enabling works in Leicester?

Yes, as part of the package. Our enabling works run from site clearance and demolition to temporary works, access roads, hoarding, traffic management, drainage diversions and service disconnections or diversions. On an older Leicestershire site that can mean taking down a redundant building and lifting its floor and yard before the plot is handed on, all with our own crews and plant.

Is the Hinckley rail freight interchange going ahead?

It was refused. The Secretary of State for Transport turned it down in March 2025, judging that its negative highway safety impacts outweighed the benefits, according to Blaby District Council. It proposed a freight interchange and up to 850,000 sqm of warehousing south-west of Elmesthorpe, next to Burbage Common and mainly in Blaby District, with new M69 slip roads and a link road from junction 2.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.