It was a complex job on a live site and your team handled it well from start to finish. Really happy with how it all came together and the site was handed over exactly as we needed it.


PKB Civils is a specialist civil engineering contractor for port-side, distribution and industrial yards around Southampton, from the Western Docks to Nursling and Marchwood. Our own crews and plant travel from Rochdale, and each job is planned in full at a free site survey before anyone sets off.
For port users, distribution firms and manufacturers around Southampton whose yard has to keep working while it's repaired or extended. Our own crews break out failed concrete, dig, lay the drainage and pour the new slabs with our own plant, and one team stays with the job from the site survey to handover.
Southampton is 191 miles from our yard in Rochdale in a straight line. A job here is planned around its scope, scale and programme, and the survey settles the phasing, the plant and the route in before a crew travels. Port-side and distribution yards are phased so the gates and loading doors stay in use while the work goes on.
Concrete yards carry the heaviest loads, on the vehicle compounds, container yards and distribution estates the port keeps busy: see concrete yards in Southampton. Drainage has to meet Southern Water's surface water policy and, near the docks, outfalls the tide can hold shut (drainage in Southampton). Groundworks starts from the peat, estuary mud and dock fill under the low ground by the Test and the Itchen (groundworks in Southampton). Earthworks decides what happens to dredged fill and old city rubble (earthworks in Southampton), and enabling works prepares plots on the Solent Freeport's tax sites and the riverside land coming forward along the Itchen (enabling works in Southampton).
Bases, trenches and walls on the peat, estuary mud and reclaimed dock land beside the Test and the Itchen.
Groundworks in SouthamptonReinforced slabs for vehicle compounds, distribution yards and port-side estates, relaid an area at a time.
Concrete yards in SouthamptonYard drainage built to Southern Water's surface water policy, with storage for outfalls the tide shuts.
Drainage in SouthamptonReduce digs, levels and spoil plans for plots on dredged fill, old city rubble and filled pits.
Earthworks in SouthamptonClearance, break-out and access for Solent Freeport plots and the riverside land along the Itchen.
Enabling works in Southampton
The same people survey, plan and build your job, and your site keeps running while we do it.
Send your briefA Southampton job can't be run on quick return visits from Rochdale, so the free survey fixes the scope, the phasing, the plant and the route in before the programme is agreed. Ben runs our pre-construction and project planning and is the person you deal with while the plan is worked through.
Our crews and plant travel from Rochdale, and our people work away from home when a job needs it. Since around 90% of what we deliver is done in house, a Southampton yard is built by the company that surveyed and planned it.
Ben credits our direct delivery model, with our own people on site, for letting us respond to a client as things happen. On a site this far from home, a change found in the dig is agreed with you there and then, by the people doing the work.
In Ben's words, “PKB Civils works exclusively on external commercial and industrial yards.” A Southampton enquiry for a house, a driveway or work inside a building gets that answer on the first call, long before anyone drives south.
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Ground, water and planning points that can reshape a Southampton job, and the page that covers each.
Up the Test and the Itchen, the British Geological Survey records peat and soft organic clay over gravel, ground no base or slab should be designed on blind. See groundworks in Southampton.
Near the docks, a high tide can stop a yard's outfall from discharging, so the drainage needs storage to wait it out. See drainage in Southampton.
Between Marchwood and Hythe, reclaimed land was built up mainly from river dredgings, which changes what a dig can keep and what has to go. See earthworks in Southampton.
Redbridge in the Western Docks and the Marchwood port land are among the Solent Freeport's tax sites. See enabling works in Southampton.
Vehicle compounds and container yards serving the port are seldom empty, so a repair there is phased area by area. See concrete yards in Southampton.
The jobs closest to Southampton.
Feedback from the people who run these sites, shown with the job we did for them.
It was a complex job on a live site and your team handled it well from start to finish. Really happy with how it all came together and the site was handed over exactly as we needed it.

Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
The port comes first. Associated British Ports says the Port of Southampton covers 726 acres and puts the jobs it supports at 45,600, with five cruise terminals working beside the cargo berths. Its compounds and container yards, and the distribution estates behind them, take the heaviest traffic in the area.
Road access decides which land stays industrial. The city council's 2022 review of industrial land generally kept sites with direct A or B road access, because industrial sites need good access for HGVs, vans and staff, and flagged sites reached through residential streets as options for release. Low bridges and protected mud flats limit marine access to some waterfront sites too.
East of the Itchen, the bridge matters as well. The council has set the Itchen Bridge toll for HGVs at a level meant to discourage them since 1977, because the route it serves is single carriageway, and in January 2024 it named strongly discouraging non-local HGV traffic as one aim of its toll changes. Our lorries would be non-local by any measure, so their route to an east-bank site is planned without it.

Can't see your question? Call us or send your brief and we'll come back to you.
Send your briefNo. Southampton's Cabinet approved a clean air plan built on non-charging measures in January 2019, after weighing a charging Class B zone, and GOV.UK's list of clean air zones in England doesn't include the city. Portsmouth's Class B zone, covering 1.16 square miles, does charge HGVs, buses, coaches, taxis and private hire vehicles, so it only matters if a route or a site falls inside it.
Not always. ABP places Marchwood Military Port in New Forest district, and the Nursling Estate is assessed in Test Valley's employment study. The Partnership for South Hampshire brings Southampton and Portsmouth together with Hampshire County Council and districts including Eastleigh, Test Valley and New Forest, so the council for a job near the city depends on which side of the boundary it falls.
It depends on the job. The forty-eight hour visits we can usually make for OL, BL and M postcodes don't stretch to Southampton, and whether a small repair justifies the trip is weighed on its scope. Where we fit is planned work: a yard repair, a drainage upgrade or an extension, phased round your site. If something must be made safe today, get that done, then send us the brief for the lasting repair.
Photos of the problem areas, a site plan or drawings if you have them, and a note of how the yard runs: opening hours, busy periods, and which gates and lanes must stay open. Tell us if the site is beyond the city boundary or east of the Itchen, because that changes the council involved and the route in. The free survey fills in the rest.
No. Our one yard is Eagle Iron Works on Rugby Road in Rochdale, where the crews are based and the plant is kept, and every Southampton job is planned from there. The crews come down for the job with our own plant, and the proposal you receive sets out the scope, the price and the programme, including how long we expect to be on your site.
Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.