Enabling works contractors in Southampton

PKB Civils is a specialist enabling works contractor getting commercial plots around Southampton ready to build, from the Solent Freeport's tax sites at Redbridge and Marchwood to the riverside land along the Itchen. Our own crews and plant travel from Rochdale to clear the plot, break out old slabs and bases, divert services and form the access.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Enabling works for Southampton's commercial and industrial sites

Send your brief

For developers, main contractors and landowners who need a Southampton plot cleared and made ready before the build, often beside a port business or estate that keeps working. Our own crews and plant do the clearance, the break-out and the diversions, and one team stays with the plot until the main contractor takes it.

The Solent Freeport's first tax sites came into force on 22 March 2022: Dunsbury Park and four parts of the Southampton Water tax site, at Fawley Complex, Fawley Waterside, Marchwood Port and Strategic Land Reserve, and Redbridge. Our enabling works service sets out each stage, from clearance to a plot ready for the build.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Enabling works in Southampton: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Clearance on port and riverside plots

    Fencing, scrub and redundant structures cleared from plots by the docks and along the Itchen, with the neighbouring business's gate kept open throughout.

    Send your brief
  • Slabs and bases broken out

    Old hardstanding and machine bases broken out and loaded away, kept apart from the soil underneath so each load is classed correctly.

    Send your brief
  • Services traced and diverted

    Live drains, cables and pipes found from drawings, scans and trial holes, then capped or rerouted before a dockside or riverside plot is opened up.

    Send your brief
  • Access, haul road and compound

    A separate construction gate, a stone haul road and a fenced compound laid first, so site traffic keeps clear of the port and estate lorries around the plot.

    Send your brief
  • Ground sampled before break-out

    Soil sampled on former gasworks and industrial land before clearance, so contaminated arisings are known about before anyone digs them.

    Send your brief

Why Southampton sites choose us for enabling works

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Every approval listed first

    A dockside or freeport plot can have more than one party to satisfy before work starts, from the landowner to a customs site's responsible authority. We list them at the survey and build them into the programme, so our crews travel down when the plot is ready for them.

  • Phased round a working neighbour

    Ben's view is that planned work can be booked round a site's busy spells and done in stages so it keeps running. Clearing a plot beside a port business that can't stop is planned that way, with the noisy break-out kept clear of its busiest hours.

  • One team from clearance to hardstanding

    Our crews can stay on after the clearance for the drainage, bases and hardstanding, so a plot this far from Rochdale needs one team mobilised and no hand-over between firms halfway through. Ben treats a yard as load-bearing infrastructure, and the hardstanding we leave is built to carry what comes next.

Getting a Southampton site ready to build?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

Before a Southampton plot is cleared

The approvals, neighbours and buried unknowns that can move a Southampton start date, with the source for each.

  • A building to come down first

    At the stalled former Toys R Us site on Harbour Parade, a 2025 Cabinet report proposed a new partnership, including the council, to take the site over and demolish the existing building before masterplanning offices, innovation space and homes.

  • Flood defences along the bank

    The Itchen's flood alleviation scheme was designed to run along the west bank past Mount Pleasant, so a riverside plot there leaves room at its edge. See drainage in Southampton.

  • A plot reached through housing

    Some older industrial plots are reached through residential streets, and the council's review flagged those as options for release, so on such a plot muck-away and deliveries are timed around the street. See civil engineering in Southampton.

  • Something nobody could foresee

    However good the survey, not everything under an old plot shows up in advance. The programme keeps a little room for the old slab or buried tank that turns up anyway.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 2
New concrete yard
The guys have been brilliant from start to finish... Thanks again to all the team and really appreciate the work you have done for us. Who knows you may end up at another AVK site in the future...
New concrete yardHyde, Manufacturing, 6 weeksSee the job

What ground and site conditions should you expect in Southampton?

Much of the land coming forward is reclaimed or long used. Plots in the Western Docks and across the water at Marchwood stand on made ground over soft estuary deposits, covered on groundworks in Southampton, so the haul road and compound go down on stone that won't sink into it, and old slabs come out with the formation beneath left undisturbed for the groundworks that follow. Stripping and break-out are timed for drier spells of weather wherever the programme allows it.

Along the Itchen, the council's 2022 review of industrial land named Drivers Wharf, Central Trading Estate, Mount Pleasant Industrial Park and the decommissioned gasholder site in the Itchen Riverside Quarter as options to consider for regeneration, noting the gasholder site's potential for contamination. On land like that, services are traced and the ground sampled before the breakers start, because what's in the soil decides where the arisings can go.

At Marchwood, part of the tax site is also a customs free zone: Customs Site No. 1 Solent, designated in August 2022 with effect for 10 years, with Solent Gateway Limited as the responsible authority. On a plot inside it, that authority is the first contact about getting plant and lorries in.

When enabling works isn't the right call

Where a plot's start depends on an approval, the approval comes first. On a waterfront plot that can mean the flood design, the ecology and the levels are settled before clearance is worth starting, and a plot cleared too early only grows back while it waits for them.

And if the job is a yard that's staying a yard, with only its slab worn out, a separate enabling package adds nothing: that's a concrete job, covered on concrete yards in Southampton. We prepare commercial and industrial plots, and say so straight away if a Southampton enquiry turns out to be housing.

Questions about enabling works in Southampton

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Is the Redbridge site in the Western Docks open for development?

It has been marketed. In March 2022 ABP began marketing the 22-acre Redbridge development site in the Western Docks, which sits within the Solent Freeport area. How it has been let or built since is a question for ABP. If you're taking a plot there, the clearance, access and any service diversions are planned with the port's own requirements in hand.

Is the Navigator Quarter one of the Solent Freeport tax sites?

Yes, the sixth. Regulations made on 22 September 2022 designated the Navigator Quarter Tax Site, in force from 14 October 2022, after the first five tax sites earlier that year. Check the official tax site map for the plot's exact boundary before a programme is built around the freeport status.

Is the Solent Gateway 2 jetty still going ahead?

Not as things stand. The Planning Inspectorate lists ABP's Solent Gateway 2, a proposed two-berth jetty for roll-on roll-off vehicle cargo with landside terminal space and a new access road to the A326, on the northern part of ABP's Strategic Land Reserve west of the tidal Test, as withdrawn, with a latest update dated 16 October 2026. Plans that assumed it need a second look.

Can a plot beside a working port business be cleared without stopping it?

Usually, if it's planned that way. The hoarding line, a separate gate for site traffic and the hours of noisy break-out are agreed with the neighbour before our crews arrive, and the heaviest work is booked around their busy periods. Their lorries keep their route in and out while the plot is cleared.

What should a brief for a Solent Freeport plot include?

The plot boundary and any drawings, the planning permission and its conditions, what's known about services and old foundations, and who controls access, especially inside the customs site at Marchwood. Keep what we find below ground too: Paul's piece on ground conditions and insurance explains why a record of it is worth having.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.