Enabling works on Bristol's commercial and industrial plots, from greenfield land at Avonmouth to working land at St Philip's Marsh, carried out by PKB Civils' own crews and plant from Rochdale. We make a plot clear and safe to build on, with its services moved and its neighbours still trading, so the main contractor can start on the planned day.
On a Bristol plot we take down what's in the way, break out old slabs and bases, find and divert live drains and cables, and set out a construction entrance and compound, all with our own crews and plant. At St Philip's Marsh that happens beside businesses that are still trading; at Avonmouth it happens on soft, low estuary ground. Our enabling works service shows each stage, from clearance to a plot ready to build on.
Two areas are bringing new plots forward. At Avonmouth, 60 hectares of greenfield land next to the industrial area is proposed for industrial and distribution use, and the St Philip's Marsh masterplan, adopted in September 2026, sets a route to new homes alongside industrial and commercial space in what is now a key employment location.
Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.
Plot clearance at Avonmouth laid out around the ecology agreed under the Hallen Marsh offsetting scheme, with any habitat kept on site fenced off first.
Send your briefFormer yard slabs, machine plinths and foundations at St Philip's Marsh broken up, with concrete and soil separated as they come out.
Send your briefDrains, cables and pipes on St Philip's Marsh plots located and made safe or rerouted before the dig, so the businesses next door keep their supplies.
Send your briefClearance on waterfront plots along the Feeder Canal and River Avon, with plant and stockpiles kept back from the edge.
Send your briefPlots on the proposed Avonmouth allocations cleared and taken to the levels their flood risk mitigation needs, ready for the groundworks.
Send your brief
The same people survey, plan and build your job, and your site keeps running while we do it.
Send your briefWe've taken down building sections in sequence on a live steel works in Scunthorpe, and a St Philip's Marsh plot beside trading businesses is run with the same care: live services traced and diverted before breaking out, and the neighbours' access kept open.
On a greenfield Avonmouth plot, the compound, haul road and access go in on stone ahead of the main contractor's start date. Ben describes a yard as load-bearing infrastructure, so a plot cleared for one is handed over with its levels checked against the design; for Portakabin at a St Helens school, we handed over a fully prepared site on programme.
At St Philip's Marsh, a plot is cleared in phases agreed with the businesses alongside, so their deliveries keep a route through. Ben puts our strength down to our own people and delivering directly, which lets us change the phasing with you in real time when a neighbour's needs change.
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Where a Bristol plot most often stalls before the build, and which of our pages covers each.
On working land such as St Philip's Marsh, old drains and cables may cross a plot where no drawing shows them. Tracing them with scans and trial holes before the break-out saves a stopped excavator and a damaged supply to the business next door.
Development at the proposed Avonmouth allocations has to include appropriate flood risk mitigation, so the levels and drainage may be fixed before clearance can finish: see earthworks in Bristol.
St Philip's Marsh stays a working employment area while its masterplan unfolds, so the neighbours' access and deliveries are agreed before the first day on site.
Development at St Philip's Marsh is expected to include flood defences, green infrastructure and a better setting for the River Avon and Feeder Canal, so clearance on a waterfront plot may need to leave room for that work.
The jobs closest to Bristol, with this kind of work first.
Feedback from the people who run these sites, shown with the job we did for them.
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Thanks so much to the team, great work as always. The yard is already making a difference to how we move around site.

Greenfield plots next to the Avonmouth industrial area sit on low estuary ground, and the soft deposits under them are covered on groundworks in Bristol. For enabling works, that means haul roads and the compound need a stone base that won't sink, and stripping topsoil in a wet spell can leave the formation churned up before the groundworks start, so the strip is timed for dry weather where the programme allows.
St Philip's Marsh is working land. Bristol's 2019 draft local plan described a 69-hectare area of industrial and distribution uses there, including waterfront along the Feeder Canal and River Avon, and the local plan expects development to improve the setting of the river and canal. Clearance there means tracing live services and diverting them while the neighbours' access stays open, and old foundations from earlier industrial use can turn up under any plot.
North of the city, South Gloucestershire Council resolved in February 2024 to approve a revised masterplan for Brabazon on the former Filton Airfield, a brownfield site. On brownfield land, old slabs and buried services are the usual first job, and the depth of any made ground is worth knowing before the plot is levelled for the main contractor.
Where the start depends on approvals, the approvals come first. On greenfield land at Avonmouth, the ecology contribution and the flood risk mitigation have to be agreed with the council before clearance, and starting early can mean redoing the work once they're settled. Until then, the time is better spent on surveys and trial holes.
If the plot is for battery storage, chargers or solar, Paul's guide to what a yard needs before a renewable installation explains the loads the ground has to take, which matters on soft estuary ground, and the enabling works may need to plan for heavier bases from the start.
Postcode districts in Bristol and Avonmouth where we've delivered: BS3, BS5, BS11.
See them on the map
Can't see your question? Call us or send your brief and we'll come back to you.
Send your briefIndustry stays in the mix. The masterplan Bristol City Council adopted in September 2026 sets a route to new homes alongside about 110,000 sqm of industrial floorspace, plus commercial space, in what is now a key employment location. Plots there will often come forward beside businesses that are still working, so clearance is planned round their access and deliveries.
Mostly clearing what earlier uses left behind. The government's 2022 funding announcement describes Temple Quarter as brownfield land, with St Philip's Marsh in its second phase, so a plot there typically starts with old slabs, foundations and live services to deal with, often beside businesses still trading. Each of those is found by survey and trial holes before the break-out.
Four greenfield sites: land at Kings Weston Lane, land east of Chittening Road, land east of Packgate Road and land south of Seabank Power Station. The 2019 draft plan proposed them, and the April 2026 main modifications keep them in Policy E4 with flood risk mitigation required. The largest, at Kings Weston Lane, is 33 hectares and already has permission, with construction under way.
Usually there's a contribution to agree first. Developers of greenfield land at Avonmouth are expected to contribute to the council's offsetting scheme for the Severn Estuary, which assumes on average 5% of each site is enhanced for ecology on site and funds the rest at Hallen Marsh, where the ASEA partnership also committed to new coastal wetland in 2020, alongside Northwick.
Yes, as anywhere around Bristol, though we have no job at Brabazon to point to yet. South Gloucestershire Council resolved in February 2024 to approve the revised masterplan for up to 3 million sq ft of commercial space alongside new homes on the former airfield, and the new station being built in North Filton was named Bristol Brabazon in March 2026.
Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.