Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.

PKB Civils is a specialist civil engineering contractor for the industrial, distribution and port-side yards of Bristol and Avonmouth. Our own crews and plant come down from our Rochdale yard, phase the work so your site keeps running, and survey your site free of charge before any price is given.
The Avonmouth and Severnside Enterprise Area is a large industrial and distribution area alongside the M5, and a yard there that serves a working shed or quay can't close for a week while its slab is relaid. Our own crews break concrete out, dig, drain and pour with our own plant, phasing the job round your traffic, and the same team stays with it from site survey to handover.
A Bristol job is planned at the free survey: we look at the yard, what's under it and how your vehicles move, and agree the phasing and programme with you. Our yard in Rochdale is about 151 miles away in a straight line. Long trips are part of our work: a London merchant's yard in Enfield was relaid by our crews without the business losing a day of trading. Our delivered postcode districts in Bristol are BS3, BS5 and BS11.
Concrete yards carry the heavy traffic on the shed and port-side estates at Avonmouth and Severnside. Drainage comes with them, built to Wessex Water's rules and around the rhines the drainage board manages on the low ground. Groundworks covers the bases, trenches and walls a yard needs, on whatever ground it stands. Earthworks sets the levels and decides where the spoil goes, and enabling works clears and prepares a plot before the build, from greenfield land at Avonmouth to St Philip's Marsh.
Bases, trenches and walls on reclaimed dock land at Avonmouth and on the Blitz rubble under the city centre.
Groundworks in BristolHeavy-duty slabs for Avonmouth and Severnside shed yards, relaid bay by bay round the tenants' trailers.
Concrete yards in BristolYard drainage built to Wessex Water's surface water rules, and to the rhines around Avonmouth and Severnside.
Drainage in BristolLevels, formation and spoil for commercial plots, from raised ground at Avonmouth to the sandstone of Redcliffe and Southville.
Earthworks in BristolClearance, diversions and access for plots at Avonmouth, St Philip's Marsh and the Temple Quarter.
Enabling works in Bristol
The same people survey, plan and build your job, and your site keeps running while we do it.
Send your briefOn a shed or port-side yard at Avonmouth or Severnside, we work through the yard in areas, returning each one to use before the next is broken out, so the trailers, forklifts and loading doors keep working round us.
Avonmouth is in Bristol, Severnside in South Gloucestershire and Royal Portbury Dock in North Somerset, and we take on external yards in all three. Around 90% of what we deliver is done by our own people with our own plant, whichever side of the boundary your site falls.
Yards at Avonmouth can stand on soft estuary ground or dock fill, so when a slab fails we look at the sub-base and the drains before pricing a new one. Ben's advice for any worn yard is to know its whole condition, then put the faults into an order of work before one of them closes a bay. If the job turns out to be domestic or inside a building, we'll say so at the first call.
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Where a Bristol job can change once the ground, the water rules or the traffic are known, with a link to the detail.
Avonmouth and Severnside sit on soft estuary deposits and land reclaimed for the docks, which decide what a base or a slab needs underneath it. See groundworks in Bristol.
New hardstanding can't send its rainwater into Wessex Water's foul or combined sewers, so the drainage has to be planned with the yard. See drainage in Bristol.
In 2023 the council's review found every unit let on the vast majority of Avonmouth's multi-let estates, so slab repairs there are phased around tenants who are trading. See concrete yards in Bristol.
At Avonmouth, localised land raising is weighed site by site against flood risk, so the finished level is settled before the dig. See earthworks in Bristol.
Greenfield plots at Avonmouth come with ecology contributions and flood mitigation to agree before anyone breaks ground. See enabling works in Bristol.
The jobs closest to Bristol.
Feedback from the people who run these sites, shown with the job we did for them.
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Thanks so much to the team, great work as always. The yard is already making a difference to how we move around site.

Bristol's commercial property falls into three sub-markets in the council's 2023 employment land review: the city centre; the Avonmouth and Severnside Enterprise Area, a large industrial and distribution area alongside the M5; and South Bristol, with estates such as Brislington Trading Estate, Cater Road Industrial Estate and Hawkfield Industrial Estate. The review also names Bristol North Fringe, with Avonmouth and Severnside, as a focal point for economic activity.
The same review recorded Panattoni building a unit at Avonmouth described as the largest speculatively developed unit in the UK, and across the Avon, Royal Portbury Dock is linked by motorway and rail: see concrete yards in Bristol.
Vehicles heading into the city may meet the Clean Air Zone, which started in November 2022. It covers only 1.18 square miles, but as a Class D zone it covers cars as well as HGVs and vans, and an HGV needs Euro VI to avoid the charge.
New plots are coming from greenfield land next to the Avonmouth industrial area and from the working land of St Philip's Marsh: see enabling works in Bristol.
Postcode districts in Bristol and Avonmouth where we've delivered: BS3, BS5, BS11.
See them on the map
Can't see your question? Call us or send your brief and we'll come back to you.
Send your briefIt can. Clean Air for Bristol, the council's own campaign site, says a vehicle driven in the zone across two days, for example entering at 9pm and leaving at 2am, pays two daily charges. That matters for an evening pour or a night delivery. The zone also takes in the Portway and the Cumberland Basin, included as busy main routes into the city, so check the route as well as the site.
Wessex Water. Bristol Water supplies water across Bristol, North Somerset and parts of Bath and North East Somerset and South Gloucestershire, and says Wessex Water provides sewerage for most of its customers. So a new connection for yard drainage, or a question about what the public sewer will take, goes to Wessex Water: see drainage in Bristol.
Yes. The council's 2023 employment land review names Bristol North Fringe, alongside Avonmouth and Severnside, as a focal point for economic activity, and its yards get the same free survey and the same phased approach as any other site in the city. Our crews and plant come from Rochdale either way, and the survey date is agreed with you once your brief is in.
It depends on the side of the boundary. Severnside, near Pilning and Severn Beach, is in South Gloucestershire, whose council deals with planning there. Royal Portbury Dock, south of the Avon, is in North Somerset. Avonmouth is in Bristol, where the city council is also the lead local flood authority that sets surface water limits for development.
The M5, according to the 2011 flood risk assessment for Avonmouth and Severnside. It expected the existing access routes into the zone holding the Bristol Port Company and the Avonmouth industrial area to flood in a tidal flood or a breach, and named the motorway, which stays dry, as the primary access route. That study came before the newer estuary defences, covered on drainage in Bristol.
Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.