1. Home
  2. Concrete yards
  3. Bristol

Concrete yard contractors in Bristol

Concrete yards for Bristol's distribution sheds, port users and trade sites, laid and repaired by PKB Civils. On a busy Avonmouth or Severnside estate we relay a failed yard bay by bay round the tenants' trailers, with our own crews and plant from Rochdale, and the free survey tells you which bays really need replacing.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Concrete yards for Bristol's commercial and industrial sites

Send your brief

On the shed and port-side yards of Avonmouth, Severnside and Portbury, we break out failed bays and pour new heavy-duty slabs with our own crews and plant. Our concrete yard work takes in new trailer parks and loading aprons as well as repairs.

The vast majority of Avonmouth's multi-let estates were fully let in 2023, the council's employment land review found, with occupiers renewing instead of moving. So a failed yard there gets relaid round tenants who keep trading. That's the job we're set up for: the order of work is agreed with the site before we start, and the tenants keep their loading doors.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Concrete yards in Bristol: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Trailer parks and drop-leg zones

    Reinforced slabs for the trailer parks and drop-leg zones round Severnside's big sheds, with joints set out for the traffic.

    Send your brief
  • Repairs round trading tenants

    Failed bays saw cut, broken out and relaid one area at a time on a let Avonmouth estate, so tenants keep trading round the work.

    Send your brief
  • Hardstanding for port traffic

    Heavy-duty hardstanding for yards serving Bristol Port on either side of the Avon, built for repeated loads on the same lines and turning areas.

    Send your brief
  • Forms, steel and pour in house

    Edge forms, steel fixing and the pour handled by our own crew, so the slab edges and joints that take the hardest traffic are built by one team.

    Send your brief
  • Joints for settling ground

    Joint layouts and sealing set out for slabs on made ground that may still settle, so a bay that moves doesn't tear its neighbours.

    Send your brief

Why Bristol sites choose us for concrete yards

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Round the tenants on a let estate

    On a busy Avonmouth or Severnside estate, we agree with the site which areas close and when, so every tenant keeps a working route to its doors. A large live yard we rebuilt in Glasgow stayed in operation for its whole programme the same way.

  • Built for Severnside's shed traffic

    Blanket consents from 1957 and 1958 let very large warehouse-style buildings go up at Severnside, and their trailers land legs and axles on the same fixed points trip after trip, so drop-leg zones and loading aprons there get a heavier specification than the rest of the yard.

  • Failed bays replaced whole

    Ben's warning is that a patch fixes the damage you can see and leaves a new joint edge where the next failure starts. On made ground at Avonmouth, where a bay may still be settling, that edge is where the next crack opens, so a failed bay is replaced whole.

Is your Bristol yard holding you back?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

What breaks up Bristol's shed and port yards

The faults that shorten a yard's life on Bristol's distribution and port-side sites, and what lies behind them.

  • Cracks that wander across a bay

    Ben reads cracking that wanders across a bay, away from the joints and edges, as movement in the sub-base or frost damage more often than overload. On Avonmouth's made ground, that sends us below the slab before anything is priced.

  • A bay rocking over softer fill

    On Avonmouth or Portbury made ground, a bay that spans a softer pocket of fill settles at one end and rocks under every passing trailer, chipping its joints.

  • Drop-leg zones giving way

    Round the big Severnside sheds, trailers drop their legs on the same spots every day, and a base built for lighter, even traffic breaks up there first, often while the rest of the yard looks fine.

  • Joints in the turning circle

    Next to the docks, heavy vehicles and plant turn on the same lines all shift, and the joints and surface in that turning circle wear out long before the rest of the yard.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 3
Modular classroom groundworks
Everything was prepared when we arrived and the school was kept running throughout. Really pleased with how it went and look forward to working with you again
Modular classroom groundworksSt Helens, Modular, 4 weeksSee the job

What ground and site conditions should you expect in Bristol?

Much of the ground at Avonmouth and Portbury has been built up several metres with man-made deposits, according to the British Geological Survey, over soft tidal flat mud and peat: the detail is on groundworks in Bristol. For a slab, that means a sub-base and joint layout designed for ground that may still settle, and a formation proved before the concrete goes down. Old yards there may also have been patched over settled ground more than once, which a look below the slab shows.

The ground is low as well as soft. Much of the tidal flat ground lies less than 6 m above OD, so a yard there has little height to shed rainwater, and a new slab's falls are set from a levels survey to carry water to the channels. The rules on where that water can go are on drainage in Bristol.

Between Bedminster and Winterbourne the bedrock is Redcliffe Sandstone, and BGS warns that the weathered sandstone used as fill has been known to give poor support: see earthworks in Bristol. Where an older yard there may have been built over that kind of fill, its sub-base is opened up and checked before a new slab is designed over it.

When concrete isn't the right call

If the trouble is the ground, new concrete on its own won't hold. Where a yard on deep soft deposits at Avonmouth keeps settling, the answer may be a deeper sub-base or ground treatment designed by an engineer first, and the slab after it.

And where water lies on a low Avonmouth yard because the channels have silted or the outfall can't take it away, the new slab should wait for the drainage to be put right, or it fails the way the old one did. Our guide to port concrete yards covers the drainage checks for a port-side yard.

A local track record

Postcode districts in Bristol and Avonmouth where we've delivered: BS3, BS5, BS11.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about concrete yards in Bristol

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
What goes into a heavy-duty slab for a Severnside trailer park?

A design for the loads and for the ground under them. For HGV and plant traffic, a typical build is 200mm of reinforced concrete on A252 mesh over a compacted sub-base, thickened where trailer legs land, with joints kept out of the wheel tracks. On Severnside's soft ground, the sub-base is designed from plate tests before the slab thickness is fixed.

Do you lay yards for the new distribution units at Avonmouth and Severnside?

Yes: trailer parks, loading aprons and service yards are our kind of work. Beyond the Panattoni units, the council's 2023 review expected more new space from Phase 2 at Central Park and from St Modwen's scheme at Severnside. Where a unit is already trading, its yard is extended or relaid in stages so the trailers keep their routes.

Should a settled Avonmouth yard be resurfaced or relaid?

It depends on whether the bays are still moving. Where made ground has finished settling and the slab is sound, re-cutting and sealing the joints and relaying the dropped bays can be enough. Where bays still rock, or the sub-base has washed out, they need replacing over a rebuilt sub-base. A levels survey and a look below the slab tell you which.

Do you work on yards around Royal Portbury Dock?

We take on external yards for port users on either side of the Avon, though we haven't yet published a port job in Bristol. Royal Portbury Dock is in North Somerset, whose draft local plan supports more port-related development there provided the roads serving the port, including access at M5 Junction 19, are improved as needed. That plan isn't adopted yet.

Do you lay yards on South Bristol estates as well as at Avonmouth?

Yes. South Bristol is one of the city's three commercial property sub-markets in the council's 2023 review, with Brislington, Cater Road and Hawkfield among its estates. A yard there gets the same free survey, and the same staged relaying round the people who use it, as one at Avonmouth.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.

Call usSend your brief