1. Home
  2. Enabling works
  3. Manchester

Enabling works contractors in Manchester

If you need room for a new building or a bigger yard on a site that's still trading, PKB Civils carries out the enabling works that come first, across Greater Manchester from our yard in Rochdale. Our own crews clear the plot and take out what's in the way, after we've walked the site on a free survey.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Enabling works for commercial and industrial sites in Greater Manchester

Send your brief

Making room for a new building on a Greater Manchester site that's still trading starts with what's in the way: old slabs and bases, drains and services, and sometimes ground that won't carry the build. We clear it and move it, phased round your yard, so the next contractor starts on the date in the programme.

All three Atom Valley sites lie wholly or partly in Rochdale, our home borough: Northern Gateway (with Bury), Kingsway, and Stakehill (with Oldham). On the Port Salford Extension, north of the A57, the planning papers say peat may be present. The full list of what we take on is under our enabling works service.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Enabling works in Manchester: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Clearance for new building

    Clearance from a spare corner of a working yard to a plot on new employment land, with the scrub, old fences and redundant structures out before anything is set out.

    Send your brief
  • Old slabs and bases out

    Hardstanding, machine bases and footings broken out and taken away, so a new building on a former works isn't set out over a forgotten footing.

    Send your brief
  • Access for big allocations

    Site roads, compounds and hoarding for plots on large allocations such as Northern Gateway, where three motorways meet.

    Send your brief
  • Services traced and moved

    Live cables and pipes traced, made safe and diverted, and redundant drains followed to where they go before they're capped.

    Send your brief

Why Manchester sites choose us for enabling works

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Demolition and pile preparation

    At a steel manufacturer's live site in Scunthorpe we took down sections of the building and readied the ground for new pile positions, so the crane runway could follow.

  • Sequence agreed before we start

    Ben leads our pre-construction, project planning and client engagement, and the clearance sequence is agreed with your site team before we start. Where the site is still trading, the clearance is phased round your yard and deliveries.

  • Ground found before it's priced

    On Greater Manchester plots the survey looks for what the county's ground can hide, from made ground on former works land to old mining on coalfield ground, before a clearance price is fixed, so surprises turn up at the survey stage, before the programme is fixed.

Getting a Manchester site ready to build?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

What holds up a Greater Manchester site before the build

The early obstacles that push a start date back on Greater Manchester plots, and how they're dealt with.

  • Spoil from Salford works land

    On old industrial land in Salford, where the council expects most land to carry some contamination, the spoil is sampled before the clearance is priced; earthworks in Manchester covers what happens to it.

  • A plot outside the joint plan

    A Stockport plot sits outside Places for Everyone, which covers the other nine councils, so its planning position comes from Stockport Council's own policies. That's worth knowing before the clearance is timed.

  • Old slabs under the scrub

    Overgrown plots on old industrial land can hide hardstanding, bases and footings, and they only show once the scrub is cut back, which is why trial holes come first on any plot like that.

  • A build date that won't move

    When a building, a crane or a main contractor is booked for a fixed date, the clearance and ground preparation have to finish first, with time held for whatever the trial holes find.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 2
Concrete repairs
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job

What ground and site conditions should you expect in Manchester?

The Port Salford Extension is a 108.6 hectare allocation proposed for logistics and manufacturing. Peat may be present, the combined authority's 2021 topic paper says, in its central and northern areas, typically about 2 metres thick, and that deeper areas may need specialist foundation techniques.

Former works land in the county brings a different list. Made ground covers large areas of the Irwell valley and central Manchester, as earthworks in Manchester explains, and under it there can be old slabs, machine bases and redundant drains. Old drains are traced to where they go before they're capped, because a pipe that looks redundant can still be live, and overgrown plots get a topographical survey and trial holes before the clearance is priced. Where the plot sits next to a business that's still trading, the hoarding and a separate site entrance go in before the first slab is broken.

On coalfield ground the mining records belong in the first desk study for any plot, before anything is broken out, and groundworks in Manchester covers the county's coalfield, including the gas that can come from concealed Coal Measures. Peat isn't confined to that one allocation either: the floodplains along the district's rivers and Chat Moss carry it too.

When enabling works isn't the right call

Atom Valley's plans include new homes as well as employment land. Housing plots aren't for us, even where they sit beside the employment land: we work only on commercial and industrial sites, and we'll say so plainly.

Nor does every yard need a full enabling package before something new goes in. A newer yard with sound concrete and working drains may need little more than ducts and small drainage changes, as our article on renewable installations explains, and a survey tells you which kind of yard you have before anything is broken out. Ben's advice is the one he gives on maintenance: get a clear picture of the yard's condition first, then deal with what matters in order.

A local track record

Postcode districts in Greater Manchester where we've delivered: BL1, BL3, BL4, BL9, M5, M6, M7, M11, M12, M13, M17, M24, M30, M40, M41, M45, M46, OL2, OL9, OL11, OL12, OL16, SK3, SK5, SK14.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about enabling works in Manchester

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
What does clearing a plot on Northern Gateway involve?

Northern Gateway is the largest Atom Valley site and Bury's largest Places for Everyone allocation, at the meeting of the M60, M62 and M66, according to Bury Council's draft transport strategy of March 2023. A plot there starts with a survey of what's on it and under it, then site roads, hoarding and clearance, planned round the build that follows.

Do we need a peat survey before building near the Port Salford Extension?

On or near the allocation, yes. The 2021 topic paper says peat may be present across parts of it, so trial pits map its depth and extent before roads, platforms or drainage are set out. Finding it after the layout is fixed means redesigning the layout, which costs time the build rarely has.

When should we apply for the sewer connection on a new building?

As early as you can, because the connection can't be made until United Utilities has approved it, as drainage in Manchester explains. Apply once the drainage layout is drawn, so the approval is in hand by the time the clearance is finished and the new drains go in.

Is Stockport part of Places for Everyone?

No. Places for Everyone is the joint plan of the other nine councils, Bolton, Bury, Manchester, Oldham, Rochdale, Salford, Tameside, Trafford and Wigan. It took effect in March 2024 and runs to 2039. For a Stockport site, check Stockport Council's own planning policy. We do work there: SK3 and SK5 are among our delivered districts.

What do you need from us to price clearance on a Greater Manchester plot?

A plan of the plot, whatever you know about its services and past use, and its planning position, whether that's an allocation under Places for Everyone or a Stockport site under the council's own policy. With those and a few photos, the free survey can go straight to what matters on the day.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.

Call usSend your brief