Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.

For freeport plots at Widnes, Newton-le-Willows and Birkenhead, and old dock and works land, PKB Civils is a specialist enabling works contractor. Our own crews and plant come from Rochdale to clear, break out and prepare ground around Liverpool, with neighbouring sites kept trading, so the main contractor can start on the date in the programme.
For developers, main contractors and owners of commercial plots on Merseyside who need the ground cleared, old slabs and bases broken out, services cut off or moved, and a compound and access road in before the build. The crews that clear a plot can stay on for its groundworks. Our full scope is on our enabling works service page.
Freeport timing matters on Merseyside. Tax reliefs in English freeport tax sites, the Liverpool City Region's included, now run to 30 September 2031, so clearance on a plot at Widnes, Parkside or Wirral Waters is worth programming early enough to leave the build its time.
Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.
Fences, scrub, redundant structures and surface clutter cleared off former dock and works plots, so the ground can be surveyed and set out properly.
Send your briefOld slabs, plinths and machine bases from a plot's earlier industrial use saw cut and broken out ahead of the new layout.
Send your briefLive services and drains disconnected or diverted before the ground is opened, on plots where old dock or rail services may still be in the ground.
Send your briefSite compounds, hoarding and temporary access roads on freeport plots, in place so the main contractor starts on the date in the programme.
Send your briefSections of buildings taken down on Merseyside sites that keep trading, with the ground prepared for new foundations.
Send your brief
The same people survey, plan and build your job, and your site keeps running while we do it.
Send your briefBen runs our pre-construction and planning, so the clearance on an old dock, colliery or works plot is sequenced with you, from what is known about the site, before the crews turn up.
At a steel manufacturer in Scunthorpe we took down building sections and prepared the ground for a crane runway's piles while the site stayed live. The same order of work suits a freeport plot.
On a freeport plot at Widnes or Newton-le-Willows, the crews that clear the ground can carry on with the drainage, bases and slabs, so the hand-over to the main contractor isn't held up waiting for a second firm.
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

The reliefs, plans and old services that decide when a Merseyside plot is ready to build on, with the source for each.
The freeport business case says MEA Park faces viability issues from low property values and high abnormal costs associated with the site's former uses, so clearance there is scoped from what those uses left behind.
The consultation on the proposed North Docks Mayoral Development Corporation closed in August 2026. In September the city council reported that 85.2% of responses supported it and that the Mayor intended to ask the government to set it up formally, subject to the combined authority's approval. Check a plot in its area against that before fixing a programme.
On land that has had several industrial uses in turn, live and redundant services both turn up, and the records are rarely complete. A services search and a scan before break-out save cutting something live.
Clearing beside a Merseyside business that is still open means hoarding, traffic management and dust control from day one, with break-out kept away from its busiest hours.
The jobs closest to Liverpool, with this kind of work first.
Feedback from the people who run these sites, shown with the job we did for them.
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.

Really happy with the result. Your team were great to have on site and we were trading throughout which was important. Thank you.

The vacant land left by declining port-related activity is concentrated in the North Docks, Speke and Garston, Edge Hill and the city centre, the city council records: see civil engineering in Liverpool. On old dock and works land the first dig can turn up slabs, bases, footings and redundant services from earlier uses. We break those out, reuse the arisings where they are suitable, and find many of them with trial pits before the programme is set.
At Parkside, the former colliery at Newton-le-Willows, the Parkside Link Road opened in May 2025 to help bring the land forward as an employment park, a joint venture of Langtree and St Helens Borough Council. On colliery land, clearance works around whatever was tipped there.
Halton's main problem sites cluster on the banks of the Mersey, where Victorian chemical works disposed of their effluent and wastes, about 400 ha in all, and its strategy names the 3MG rail freight facility among the areas being promoted for redevelopment; the first works there are covered on earthworks in Liverpool. The freeport business case describes its sites as derelict dockland and former colliery and industrial land, and says the dock wall at MEA Park, on the 100 ha Wirral Waters tax site, needs strengthening for heavy goods handling.
If a plot sits behind a dock wall that still needs strengthening, as MEA Park's did in 2022, the wall's design comes first, because it sets how much load the land behind can take while it is cleared.
Where a scheme is housing, it isn't one for us. We prepare commercial and industrial sites only, and we will say so at the first call, so nobody loses time.
And if a plot needs piles or a ground treatment designed by a specialist, that design comes first, because it decides the working levels and where the rig will stand. We clear the site and get the ground ready for it.
Postcode districts in Merseyside, Cheshire and Warrington where we've delivered: CH2, CH4, CH65, L8, L20, L30, WA1, WA3, WA7, WA9, WA11.
See them on the map
Can't see your question? Call us or send your brief and we'll come back to you.
Send your briefThree, designated from 22 March 2022: 3MG in Widnes, Parkside East and West in St Helens, and Wirral Waters on the Birkenhead docks. The freeport business case names the Port of Liverpool as the freeport's Primary Gateway, alongside the tax sites and a primary customs site at Liverpool John Lennon Airport. If your plot is on one of them, say so in the brief, because it tells us what the land was used for before.
Yes. We clear the plot, break out old slabs and bases, disconnect or divert services and put in the compound, hoarding and access road, then hand the site over ready for the main contractor's start date, agreed with you both before we start. If the plot will carry solar panels, chargers or battery storage, what the ground needs for a renewable installation is worth reading before the design is fixed.
Yes, once the wall's designer has set the loads and the exclusion zone. Clearance, break-out and compounds are then planned so plant, stockpiles and lorries stay outside that zone, and the land side is ready when the wall is, as it would need to be at MEA Park.
Any site investigation already done, a services search, the planning conditions, and on Halton land the council's current position on contamination for the plot. On a tax site, add the dates you're working to under the reliefs, because they set how much time the clearance can take.
Yes. Drains and services are traced, disconnected or rerouted before break-out starts, working to each utility's requirements, with United Utilities' agreement first wherever a public sewer is involved. Old dock and rail land often has runs nobody has on a drawing, so the survey and scan come before the programme is fixed.
Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.