What ground and site conditions should you expect in Liverpool?
Under the river, the Mersey has cut a buried channel to 28 m below OD, partly filled with till, and at Dingle, where it has also been confirmed, it is excavated to about 50 m below OD, according to the British Geological Survey. Boreholes show the channel's base undulates, a line of interconnected enclosed hollows, so depth to rock varies and is proved by investigation, which matters for piles and deep bases.
Along the waterfront, Liverpool's docks are mapped as made ground, worked and infilled, and the land built out behind the docks and coastal defences is treated as reclaimed. No thickness is given for that made ground: it is described as highly variable in make-up, thickness and properties, possibly uneven and compressible, and site investigation is advised to find its depth and type.
Inland, the drift over the sandstone is absent or thin across most of the city, according to the council's contaminated land strategy, and where it is present it is mostly glacial boulder clay, with blown sand under the airport and along the city's northern boundary. On many inland sites a base or trench reaches the sandstone at no great depth.
Water is the last check. The Sherwood Sandstone is the district's main aquifer, and as pumping from it has fallen away, groundwater has risen in places and caused local engineering and flooding problems, so a deep dig is planned with pumps to hand.
When groundworks isn't the right call
If the trouble is water lying on the yard after rain, start with the drains before any new base. A camera survey shows whether a channel or gully has failed, and that is drainage in Liverpool.
If the ground is contaminated, as it can be on old chemical works land in Halton, the remediation is agreed first and the groundworks follow it: see earthworks in Liverpool.
And on St Helens land with a coal mining history, the records of the Coal Authority, which now trades as the Mining Remediation Authority, come first, with a Coal Mining Risk Assessment where planning applies. A pad is far easier to move on paper than after it's poured.