Groundworks contractors in Liverpool

For bases, trenches and retaining walls on Liverpool sites, PKB Civils is a specialist groundworks contractor with its own crews and plant from Rochdale. After a free survey we dig trial holes before anything is designed, because dock fill, boulder clay and sandstone all occur across the city, and the yard stays open while the work goes on.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Groundworks for Liverpool's commercial and industrial sites

Send your brief

This page is for site and facilities managers on Merseyside who need a base, a trench, a wall or a new sub-base without closing the yard round it. One team surveys, digs and builds it, with plant from our Rochdale yard. Our groundworks service sets out everything we do.

On Liverpool sites the first questions are how deep the fill or clay runs before the sandstone, and whether a dig will meet water. We answer them with trial holes before the work is designed in detail, so the base you pay for suits the ground you actually have. The answers decide whether a base can sit on the ground as it is or needs to go deeper.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Groundworks in Liverpool: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Bases on dock fill

    Plant and racking bases on reclaimed dock land, sized once trial holes have shown how deep the fill runs and what it is made of.

    Send your brief
  • Piled bases near the estuary

    Piled bases near the river, designed once the investigation has proved rockhead over the buried channel.

    Send your brief
  • Trenches planned for water

    Drainage and duct trenches dug with pumps and trench support ready, on ground where water may be met.

    Send your brief
  • Walls where levels step down

    Retaining walls where a Merseyside yard is pushed out onto new ground or the levels step down, founded on what the trial holes show.

    Send your brief
  • Sub-base on clay and fill

    The formation dug out and rebuilt for a new slab, whether it sits on boulder clay or old dock fill.

    Send your brief

Why Liverpool sites choose us for groundworks

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Groundworks delivered near Liverpool

    At a St Helens primary school we built the foundation pads for modular classrooms, with the drainage connections, electrical trenching and access ramps, over a 4-week programme. Every stage was sequenced around the Portakabin programme and the school calendar, and the site was handed over fully prepared, on programme, with pupils and staff kept clear of the works.

  • Trial holes before a base is sized

    Dock fill, boulder clay and sandstone all occur across the city, and a base sized from a single hole can end up half on fill. So we dig across the footprint before anything is set out.

  • Checking for voids first

    A hollow sound underfoot is, in Ben's view, one of the clearest signs of voids under a slab, so on an older dockside yard we check for it before a base is replaced.

Planning groundworks on a Liverpool site?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

What to check before digging on Liverpool sites

Ground problems that change a groundworks job on Merseyside, and the record or experience behind each one.

  • A slab sinking on dock fill

    Ben's experience is that by the time a slab visibly sinks, the damage to the sub-base underneath is already extensive. On dock fill that is easily blamed on the fill settling, so the drains and sub-base are checked first. A pothole patched over that sub-base, Ben adds, will break up again within months: more in why yard potholes keep coming back.

  • Cracks that point to the cause

    Cracks that follow joints and slab edges usually mean load. Random cracking across a bay, in Ben's view, points to frost or a sub-base on the move, which means looking under the slab before anyone replaces it.

  • Deep clay at Fazakerley

    Near Fazakerley Hospital the drift is more than 30 m thick, the council's strategy notes. Bases there are designed on what the drift will carry, which the investigation has to test.

  • Salt water by the estuary

    Over-abstraction has drawn salt water into the sandstone next to the Mersey estuary, the BGS records. Water struck in a dig near the river is worth testing before it is pumped anywhere.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 2
Concrete repairs
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job

What ground and site conditions should you expect in Liverpool?

Under the river, the Mersey has cut a buried channel to 28 m below OD, partly filled with till, and at Dingle, where it has also been confirmed, it is excavated to about 50 m below OD, according to the British Geological Survey. Boreholes show the channel's base undulates, a line of interconnected enclosed hollows, so depth to rock varies and is proved by investigation, which matters for piles and deep bases.

Along the waterfront, Liverpool's docks are mapped as made ground, worked and infilled, and the land built out behind the docks and coastal defences is treated as reclaimed. No thickness is given for that made ground: it is described as highly variable in make-up, thickness and properties, possibly uneven and compressible, and site investigation is advised to find its depth and type.

Inland, the drift over the sandstone is absent or thin across most of the city, according to the council's contaminated land strategy, and where it is present it is mostly glacial boulder clay, with blown sand under the airport and along the city's northern boundary. On many inland sites a base or trench reaches the sandstone at no great depth.

Water is the last check. The Sherwood Sandstone is the district's main aquifer, and as pumping from it has fallen away, groundwater has risen in places and caused local engineering and flooding problems, so a deep dig is planned with pumps to hand.

When groundworks isn't the right call

If the trouble is water lying on the yard after rain, start with the drains before any new base. A camera survey shows whether a channel or gully has failed, and that is drainage in Liverpool.

If the ground is contaminated, as it can be on old chemical works land in Halton, the remediation is agreed first and the groundworks follow it: see earthworks in Liverpool.

And on St Helens land with a coal mining history, the records of the Coal Authority, which now trades as the Mining Remediation Authority, come first, with a Coal Mining Risk Assessment where planning applies. A pad is far easier to move on paper than after it's poured.

A local track record

Postcode districts in Merseyside, Cheshire and Warrington where we've delivered: CH2, CH4, CH65, L8, L20, L30, WA1, WA3, WA7, WA9, WA11.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about groundworks in Liverpool

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
How deep is the made ground under Liverpool's docks?

Nobody can say without digging. What is on record is the scale: between 1825 and 1860, the city council records, 21 docks and 10 miles of new quayage were built, more than half of the city's dockland. So a dockside yard is treated as fill until trial holes across the footprint show where it ends, and the base is designed on what they find.

Will a deep trench on a Liverpool site take on groundwater?

It might. As pumping from the sandstone aquifer has declined, rising groundwater has caused local engineering and flooding problems in the district, the British Geological Survey records. Whether a trench takes on water depends on its depth, the season and the site, so trial pits record any water struck, and how fast it comes in, before the dig is planned.

Will a new retaining wall by the docks need piles?

It may. The BGS describes made ground as highly variable in make-up and thickness, possibly uneven and compressible, and advises site investigation to find its depth and type. Whether a wall by the docks can stand on a spread foundation or needs piles down to firmer ground is decided by that investigation, and the wall and the yard behind it are designed together.

Is the ground by Liverpool's airport different from the docks?

Often, yes. Blown sand lies under the airport and along the city's northern boundary, the council's strategy notes. Loose sand runs when a trench is opened, so on those sites trench support is planned from the start, and bases are sized on what the sand will carry once it is compacted.

Do you take on groundworks on the Wirral as well as in Liverpool?

Yes. The BGS puts the Wirral on the same Permo-Triassic bedrock as Liverpool, and the work runs the same way: trial holes first, then bases, trenches and walls sized to what they find. Crews and plant travel from our yard in Rochdale for each job, whichever side of the river it is on.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.

Call usSend your brief