1. Home
  2. Concrete yards
  3. Manchester

Concrete yard contractors in Manchester

PKB Civils lays and repairs concrete yards for merchants, manufacturers and warehouse operators in Greater Manchester, from Trafford Park's raised fill to the newer estates along the M62. Our own crews pour every slab, and we phase the work so lorries keep moving and the yard stays open while it's rebuilt.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Concrete yards for commercial and industrial sites in Greater Manchester

Send your brief

We lay new concrete yards and rebuild worn ones for Greater Manchester businesses whose yards carry HGVs and plant every working day, from Trafford Park to Bolton and Hyde, and where a yard has run out of room we extend it. Our concrete yard work lists everything we take on.

If your yard is on Trafford Park, which a combined authority announcement in 2018 called the largest industrial estate in Europe, it may stand on the raised fill the BGS records under a large area of the estate. Fill can settle unevenly, and a repair that ignores what's underneath won't last.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Concrete yards in Manchester: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Yards on Trafford Park fill

    Slabs for yards on the estate's raised fill, with bays and joints laid out for the settlement that fill brings.

    Send your brief
  • Warehouse yards on new land

    HGV yards and service roads for warehouses on new land such as Bolton's allocations in the Wigan-Bolton Growth Corridor, poured in bays so finished areas can take traffic first.

    Send your brief
  • Merchant yard extensions

    More slab for builders merchants, like the Bolton and Rochdale yards on our projects page, specified for the deliveries, collections and forklifts that cross it all day.

    Send your brief
  • Bays recast on a trading yard

    Damaged bays cut out and recast one area at a time on estate yards that can't close, such as those on Trafford Park, with the rest of the yard kept in use.

    Send your brief
  • Machine and plant bases

    Reinforced bases for plant and equipment on factory yards, sized for the load and the ground under them, whether that's till, fill or made ground.

    Send your brief

Why Manchester sites choose us for concrete yards

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • From cleared site to finished yard

    For Barrett Steel in Bolton we cleared the site and built the yard on it: brush-finished hardstanding with bullnosed edges, new ACO channels and a separator tank, a retaining wall along the boundary, and lighting towers and racking in place.

  • Every bay tested

    AVK's new yard in Hyde is a C40 fibre-reinforced slab on A252 mesh and a membrane, dowelled into the existing concrete. The joints were saw cut, a curing agent went on, and cube tests were taken from each bay.

  • Our own concrete layers and steel fixers

    Our own concrete layers and steel fixers set the formwork, fix the steel and pour, because Ben's view is that formwork decides most of how a slab turns out. His formwork article explains what goes wrong when it doesn't.

Is your Manchester yard holding you back?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

Why Greater Manchester yard slabs fail

From Trafford Park's fill to new warehouse land, and the two signs Ben looks out for.

  • Patching over moving fill

    On Trafford Park's raised fill, a crack that keeps coming back can mean the ground under the bay is still moving, and each new patch adds a joint edge for the next crack to start from.

  • Yards for the new warehouse land

    Bolton has allocated land at Bewshill Farm, Chequerbent North and west of Wingates for new industrial and warehouse floorspace. A yard laid for a first occupier's vans may not suit the HGVs of the next, so on new warehouse plots it pays to design for the heaviest likely use.

  • Formwork that shows up later

    Poor formwork, in Ben's view, often lies behind slab edges that crack early, joints out of line and surfaces that won't drain, and it may not show for months or years.

  • A hollow sound on the fill

    A stretch of yard that sounds hollow underfoot points to voids forming under the slab, in Ben's view, and on Trafford Park's fill that is worth investigating straight away instead of watching.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 2
Concrete repairs
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job

What ground and site conditions should you expect in Manchester?

The British Geological Survey records Trafford Park's raised fill as typically 2 to 3 m thick and locally over 8 m. On fill like that a new yard starts below the slab: the formation is tested to see what it will carry, soft pockets are put right, and the sub-base is built up to suit the loads. Where the fill runs deepest, digging it all out isn't realistic, so the sub-base and slab are designed for the ground that's there. On Trafford Park, then, the work below the slab matters as much as the slab itself, because fill that settles unevenly can undo a yard that was otherwise built well.

Trafford Park yards seldom stop for a rebuild, so new bays go in beside old ones. Dowels tie each new bay into the concrete that stays, and joints follow the traffic lines and bay edges, so the movement the fill brings is taken at a joint where it can be sealed. Each new bay is kept out of use until it is strong enough for lorries. The yard stays open while it's rebuilt, a bay at a time.

Elsewhere, the natural ground is covered under groundworks in Manchester and the made ground under earthworks in Manchester.

When concrete isn't the right call

If what's wrong is the ground itself, say a corner of a Trafford Park yard where the fill has dropped, the dig-out is an earthworks job before it's a concrete one, and the slab follows once the ground is right.

Not every damaged bay means a new yard either. Localised repairs and joint filling rarely need new formwork, in Ben's view, which keeps small jobs small on a merchant's yard in Bolton or Rochdale that can't spare a bay for long.

And where a plot still has old buildings or bases on it, clearing them is enabling works, done before any slab is set out.

A local track record

Postcode districts in Greater Manchester where we've delivered: BL1, BL3, BL4, BL9, M5, M6, M7, M11, M12, M13, M17, M24, M30, M40, M41, M45, M46, OL2, OL9, OL11, OL12, OL16, SK3, SK5, SK14.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about concrete yards in Manchester

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Where are Greater Manchester's new warehouse yards coming forward?

Bolton is one place. It has allocated land at Bewshill Farm, Chequerbent North and west of Wingates for around 500,000 sq metres of industrial and warehousing floorspace in the Wigan-Bolton Growth Corridor, according to Bolton Council. At Irlam, Port Salford has permission for around 150,000 sqm of warehousing, with a rail spur onto the Chat Moss line and canal berths as part of the permitted scheme. Both mean HGV yards.

Is Kingsway Business Park close to your yard?

Yes, both are in Rochdale. Kingsway is a 420 acre site with its own Metrolink stop, linked straight to the M62 at junction 21, and Amazon, Dachser and Takeuchi Manufacturing are among its occupiers. If your yard is there, a survey is a short trip for us.

How long does a new concrete yard take in Greater Manchester?

On the yards on our projects page, six weeks for AVK's in Hyde and eight for Barrett Steel's in Bolton. Size, access and how much of the yard has to stay open set the programme, and you have yours before we start.

Can a Trafford Park yard be replaced while the business keeps running?

Yes. The yard is split into areas, each one fenced off, broken out and recast while lorries use the rest, and a route in and out stays open throughout, so the business never loses its whole yard at once, and finished areas go back into use as they're done.

What does the survey look at on a Trafford Park yard?

How the yard is used and what drives on it, where its water goes, and the state of the slab and joints. On the estate's fill it also looks at which bays have settled and by how much, because that decides whether repairs will last or a rebuild makes more sense.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.

Call usSend your brief