It was a complex job on a live site and your team handled it well from start to finish. Really happy with how it all came together and the site was handed over exactly as we needed it.


PKB Civils is a specialist concrete yard contractor for manufacturing and distribution sites in Sheffield and Rotherham, from Tinsley Park by the M1 to the Advanced Manufacturing Park at Waverley. We send our own crews and plant from Rochdale to build new heavy-duty yards and relay failing ones a bay at a time.
For managers of Sheffield and Rotherham yards that take forklifts, loading shovels and HGVs every day and are starting to show it, from cracked bays at the loading doors to patches that keep breaking up. We build the yard itself: the failed concrete is cut out, the sub-base rebuilt and new reinforced slabs laid, all by our own crews.
In the council's 2009 Core Strategy, the Lower Don Valley comes first among Sheffield's locations for manufacturing, distribution and warehousing, and Attercliffe/Newhall and Parkway/Kettlebridge, with their large concentrations of industry and warehousing, are kept for that work. For a yard on those estates, that means heavy traffic for years to come, so it pays to specify for it now and not patch it later. New yards, resurfacing and repairs are all part of our concrete yard work.
Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.
Reinforced slabs for forging, casting and engineering works, specified for the plant and axle loads that really use them.
Send your briefHardstanding for Tinsley Park's warehousing, where HGVs come straight off the motorway and brake and turn hardest at the gates.
Send your briefFailed areas cut out and relaid one at a time, each back in use before the next closes, so loading doors stay reachable.
Send your briefPatches that keep failing cut back to sound material and rebuilt from below, so the repair outlasts the last one.
Send your briefNew yards for manufacturing and research units at Waverley, set to the levels and falls the drainage design needs from day one.
Send your briefReinforced bases for presses, compressors and racking, poured inside a yard that keeps working around them.
Send your brief
The same people survey, plan and build your job, and your site keeps running while we do it.
Send your briefAt our steel job in Scunthorpe, the new external slabs went in beside a crane runway on a site that stayed live, each stage in the right sequence after the demolition and the ground preparation for the piles.
Our starting point for an HGV yard is reinforced concrete at least 200mm thick on A252 mesh, going heavier at Tinsley Park's gates or wherever loading shovels work on a valley-floor yard. Ben's rule for an HGV base is that its level, its thickness and its joints all have to be right, because formwork set out badly turns a cosmetic fault into a structural one.
Before a Sheffield yard is priced, the survey records what actually drives on it, from loading shovels at a forge to HGVs off the M1, and what it stands on. The slab is specified from that, which is why two yards on the same estate can need different concrete.
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

What we look for first when a heavy-duty Sheffield yard starts to fail.
Where a Tinsley Park site handles freight with loading plant, that plant turns and brakes on the same few square metres all day. Those areas fret and crack long before the rest of the yard, and need a heavier slab with the joints kept out of the plant's path.
On a sloping Sheffield site, the yard's falls have to send water into the channels before it runs off the edge, so the falls are fixed from the drainage layout and checked on the ground before every pour.
Many of Rotherham's old steel and mining sites have been redeveloped (civil engineering in Sheffield has the background), and a yard laid then may now carry more than it was built for.
Infilled ponds are among the potentially contaminated sites Sheffield's council has listed, so a yard that keeps settling in one patch may be over one, as earthworks in Sheffield explains.
The jobs closest to Sheffield, with this kind of work first.
Feedback from the people who run these sites, shown with the job we did for them.
It was a complex job on a live site and your team handled it well from start to finish. Really happy with how it all came together and the site was handed over exactly as we needed it.

Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Thanks so much to the team, great work as always. The yard is already making a difference to how we move around site.

What a Sheffield yard stands on depends on where it is. On the valley floor it is often thin river deposits, soft near the surface (groundworks in Sheffield has the detail), and on a former works plot there may be steelworks fill above them that changes from one bay to the next (earthworks in Sheffield). Either way, the sub-base is designed for what the survey finds before a slab thickness is chosen.
What it carries depends on the estate. At Tinsley Park the same 2009 plan makes industry and warehousing/distribution the major land uses, making particular use of rail freight facilities, and notes the area is conveniently located for the M1 at junction 33 and junction 34. A yard there takes HGVs straight off the motorway at its gates, where braking and turning are hardest, so the gates get the heaviest slab and a brushed, slip-resistant finish, and any area where freight is handled gets a heavier specification of its own.
On the Lower Don Valley floor, a yard may also have been under water at some point (drainage in Sheffield covers the valley's flood history), and a sub-base that was flooded and only patched since is worth checking before any resurfacing.
A pothole on otherwise sound ground can be cut out and repaired on its own. The trouble starts when the ground under it has gone, and on soft valley deposits or old works fill that is the first thing to check. In Ben's words, “A pothole gets filled. But if the sub-base beneath it has failed, the fill will break down again within months.” Each patch also leaves a fresh joint edge for the next failure to start from, as he explains in his piece on reactive yard maintenance.
And on a former works plot where old fill under the yard is the real problem, the answer starts with earthworks: the poor fill comes out and is replaced before any new concrete goes down.
Postcode districts in Sheffield, Rotherham and north Derbyshire where we've delivered: S9, S44, S60, S65, S80.
See them on the map
Can't see your question? Call us or send your brief and we'll come back to you.
Send your briefYes. Steel sites put heavy, concentrated loads on a yard, from stock and cranes to loaders working every shift. A Sheffield works gets a slab specified for its own heaviest loads and thickened where they concentrate, with the joints set out around the plant that uses it.
Yes. Markham Vale, reached by its own M1 junction, 29a, will deliver over 127 ha of employment development across Chesterfield, Bolsover and North East Derbyshire, according to Chesterfield Borough Council. New units there need yards built for HGVs from the start, and the survey is free there just as it is in Sheffield.
It can. Ready-mix arrives in HGVs, and the Clean Air Zone charges non-compliant ones inside Sheffield's inner ring road and city centre. For a yard inside that area, the supplier's fleet and delivery times are worth settling before the pour is booked. Civil engineering in Sheffield has the zone's rules.
Yes. The Advanced Manufacturing Park was developed on 150 acres within the wider 740-acre Waverley neighbourhood, with manufacturers and research centres side by side. A new yard there is laid beside buildings that keep working, to levels and falls that keep water away from their doors.
Yes, once the formation is tested and the remediation scheme allows for it. A cover layer or treated ground has to stay intact, so the scheme and the ground report set what can be dug into, and the sub-base is built up on top to the levels the scheme allows. On Sheffield's reclaimed land, that check comes before the slab is designed.
Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.