PKB Civils is a specialist commercial drainage contractor for industrial yards in Sheffield and Rotherham, where low, flat ground by the Don, and the council's runoff limits on redeveloped yards, shape the design. Our own crews and plant come from Rochdale to lay and repair yard drainage while the site keeps working.
For Sheffield and Rotherham site managers with water lying on the yard after rain, a separator that hasn't been emptied or inspected for too long, or a redevelopment whose drainage the council has to approve. We only take on commercial and industrial yards.
In the Lower Don Valley, a yard's drainage has the river and the council's runoff limits to answer to, and we design and build for both. Our own crews put back the concrete over the new drainage in the same programme, so the yard isn't left half finished. Our drainage service covers channels, gullies, separators and attenuation.
2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986
Drainage in Sheffield: what we do
Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.
Channels across loading areas
Heavy-duty channels across loading and turning areas, laid with the concrete either side so the levels meet and water has somewhere to go.
One of Ben's own cases is a Yorkshire recycling site with water standing on its main vehicle circulation area, where the channels still looked intact from the surface. The survey found three lengths cracked along their base by the traffic, so the water was getting past the drains and into the sub-base, and the site had spent two years patching the surface cracks it caused. When a Lower Don Valley yard keeps failing in one place, that's the first thing we look for.
The drainage before the concrete
Poor drainage, in Ben's experience, breaks up industrial yard concrete sooner than vehicle weight does. A Sheffield yard that's cracking should have its drains looked at before anyone prices new slabs.
Levels right on flat ground
On the valley floor's flat yards, channels have little fall to work with, so the levels are set out to the drainage design and checked before concrete goes down around them.
Standing water on a Sheffield yard?
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.
Local rules and conditions that decide how a Sheffield or Rotherham yard is drained.
A runoff limit on redevelopment
Through planning, the Core Strategy cuts surface water to 5 litres per second per hectare on sites over a hectare, or by 30% on brownfield sites where existing runoff can be proved. Smaller sites cut it as far as feasible, with measures such as permeable paving.
A statement for major schemes
For major applications, the council's SuDS page asks for a SuDS Design Statement, and the Lead Local Flood Authority is a statutory consultee, so the yard's drainage design needs settling early in the scheme.
Outfalls behind flap valves
A yard that drains straight to the Don through a flap valve can't discharge while the river is high and the valve is shut, so its storage needs enough volume to hold the rain until the level drops.
Yards on the left bank
The Don floods mainly on its left bank in the Lower Don Valley, the Savile Street and Brightside Lane side, so yards there get their levels, outfalls and storage checked against the river first.
Our nearest projects to Sheffield
The jobs closest to Sheffield, with this kind of work first.
Feedback from the people who run these sites, shown with the job we did for them.
1 / 3
“
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job
“
It was a complex job on a live site and your team handled it well from start to finish. Really happy with how it all came together and the site was handed over exactly as we needed it.
External groundworks and new concreteScunthorpe, Manufacturing, 24 weeksSee the job
“
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Yard extension and retaining wallBolton, Builders merchantsSee the job
What ground and site conditions should you expect in Sheffield?
The Lower Don Valley is Sheffield's lowest and flattest ground. Storms in June 2007 flooded as many as 2,300 properties across the city and hit the valley hardest, the council's 2013 flood defence business plan records. Its project boundary spans 8km of river from Nursery Street in the city centre to Blackburn Brook at the M1, operating as one flood cell, and in places the existing defences were estimated to give only one-in-25-year protection.
Since January 2018 the valley has had new gravity walls, flood gates and hundreds of flap valves along 8km of the Don, protecting more than 500 businesses and around five thousand jobs, the Environment Agency announced. Behind those defences, every yard still has to get rid of its own rain, and on ground this flat a blocked channel or a sunken gully shows up very quickly as standing water on the yard.
In Rotherham, the council finished a concrete flood wall between the railway and the canal, from Ickles Lock to Centenary Way, in July 2023, part of a scheme along the Don through Templeborough, the town centre and Parkgate that aims to reduce the impact of severe flooding from heavy rains like those of 2007 and 2019.
When new drainage isn't the right call
A wet Sheffield yard doesn't always need new pipes at all. Channels usually silt up or crack slowly, often over more than a year, with the standing water lasting a little longer each winter, and the fix is often clearing one run or replacing one cracked length.
And if the water is the river coming over its banks, yard drainage on its own can't hold it back. That's a matter for flood defences and for how the site and its buildings are protected, and our article on ground conditions and insurance covers why the difference matters when a claim is made.
A local track record
Postcode districts in Sheffield, Rotherham and north Derbyshire where we've delivered: S9, S44, S60, S65, S80.
What flood risk must a new Sheffield yard's drainage be designed for?
On a scheme that needs planning, the council's SuDS checklist asks you to show surface water flood risk managed up to 1 in 100 plus 30% for climate change. It also sets a maximum fall of 1 in 20 for permeable paving, which matters on sloping sites. Storage under the yard and the falls of the surface are designed together to meet it.
Can our Sheffield yard drain to a soakaway?
Only if the ground proves it can take the water. Where infiltration is proposed, the council's checklist asks for a four seasons test, so the result holds in a wet winter as well as a dry summer, along with a risk analysis showing the water won't cause down-slope or stability problems. If the tests fail, the water goes to storage under the yard and leaves at a controlled rate.
Does a redeveloped Lower Don Valley yard need storage under it?
Usually, if the redevelopment goes through planning. The council's runoff limit sets the rate the yard may discharge at, so storage under the yard holds back whatever falls faster than that and releases it slowly. A yard that also outfalls straight to the Don behind a flap valve needs that storage checked for volume as well.
Can a separator go in without closing our Rotherham yard?
Yes. The tank dig is fenced off and the channels feeding it go in a length at a time, with the concrete over them put back by the same crew, so drivers lose one strip of yard at a time. They're told which strip is closed and when it reopens, and the separator is connected once the run feeding it is complete.
How do we prove our old yard's runoff for the brownfield option?
On a brownfield Sheffield site, the brownfield option depends on proving the existing surface water runoff. A camera survey of the existing drains and outfalls shows what is connected and where it goes, and your drainage designer uses that to work out the existing rate before the new system is sized.
Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.
We use cookies to see how people use our site and to measure our adverts. They're on unless you choose Reject all. Privacy policy
Necessary
Needed for the site to work, such as remembering your cookie choice. They don't store anything that identifies you.
Always active
Analytics
Google Analytics and Microsoft Clarity show us how people use the site, such as which pages they visit and where they came from, so we can improve it.
Advertising
HubSpot, Google Ads and WhatConverts cookies measure how our adverts perform and connect an enquiry or phone call to the advert or page that led to it.