From Aire Valley distribution sites to waste and manufacturing yards in east Leeds, PKB Civils puts in and repairs yard drainage as a specialist commercial drainage contractor. Our crews and plant travel from Rochdale, each job is phased round the yard's traffic, and the survey that starts it is free.
For Leeds site and facilities managers redeveloping a yard, or living with one that floods. Redevelop, and the council's flood standards ask for at least a 30% cut in peak surface water flow where a minor development already has a connection, and 50% on a major one where a drainage survey proves the existing connection. Whether the yard counts as minor or major, and whether that connection can be proved, decides how much storage it needs.
We put in the channels, separators and attenuation that meet that cut, along with gully repairs and new connections, using our own crews and plant. Our drainage service has the full list of what we install on a working yard.
2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986
Drainage in Leeds: what we do
Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.
Channels on vehicle routes
Heavy-duty channel drainage across the main routes and in front of loading doors, laid to falls that move water off the yard before it finds a joint.
At a recycling facility in Yorkshire, standing water turned out to come from cracked channels, as groundworks in Leeds tells.
Repairs sized to the fault
Where only one length of channel has failed, we replace that length and reinstate the concrete around it before the area reopens, so a Leeds yard isn't dug up further than the fault needs.
A survey before any design
On a Leeds redevelopment the cut turns on proving the old connection, so we'd jet the existing runs and check them on camera before designing anything.
A yard that floods now
If your Leeds yard already floods after rain, we start there: find whether the channels are blocked, cracked or too small, and fix that first, leaving the redevelopment rules for when the yard is rebuilt.
Standing water on a Leeds yard?
Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.
The council's surface water rules, the river, and a failure that's often blamed on something else.
No proof, greenfield rates
Where a drainage survey can't prove the old connection on a major redevelopment, greenfield rates apply instead under the council's standards, which can mean far more storage on site than the same yard would need with its connection proved.
Floors before falls
For industrial and warehouse development, the council's standards set a freeboard of at least 300mm above the design flood level, so on a site near the Aire the levels are fixed before the drainage is drawn.
Defended, but still wet
The flood scheme protects against the river. Behind it, a yard whose channels and outfalls can't keep up can still flood from its own storm, so the defences are no reason to put off a failing system.
Concrete blamed on lorries
Ben's view is that poor drainage breaks up yard concrete faster than vehicle weight does, so a Leeds yard that's cracking near its channels gets its drainage checked before anyone prices new slabs.
Our nearest projects to Leeds
The jobs closest to Leeds, with this kind of work first.
Feedback from the people who run these sites, shown with the job we did for them.
1 / 3
“
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job
“
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Yard extension and retaining wallBolton, Builders merchantsSee the job
“
It was a complex job on a live site and your team handled it well from start to finish. Really happy with how it all came together and the site was handed over exactly as we needed it.
External groundworks and new concreteScunthorpe, Manufacturing, 24 weeksSee the job
What ground and site conditions should you expect in Leeds?
Flood risk on a Leeds site starts with the River Aire. On Boxing Day 2015, Storm Eva took it to the highest level it has ever reached and damaged thousands of homes and hundreds of businesses across fourteen Leeds wards, the council recalls in its release marking ten years since.
The Leeds Flood Alleviation Scheme followed. Its first phase opened in October 2017, with moveable weirs at Crown Point and Knostrop, giving thousands of homes and hundreds of businesses protection against a flood with a 1 in 100 chance in any year, plus an allowance for climate change to 2069. The second phase, completed in November 2024, runs from Leeds City Station along the Kirkstall Road corridor to Apperley Bridge, gives one-in-200-year protection plus a climate change allowance, and includes a flood storage area at Calverley.
On a riverside yard, each outfall is placed where it can still discharge when the Aire is running high after heavy rain, so a high river doesn't back water up the system, and separators near the river are sized so oil from a fuelling or wash area doesn't reach it. Our guide to weather-proofing a yard covers what to check on a yard that's already built.
When new drainage isn't the right call
Often the channels are already there and only need jetting, or one cracked length replacing. Drainage that was right when it went in can stop working after years without maintenance, with no single failure to point to, and a survey shows whether that's the problem.
A failing channel in front of one door doesn't need a full redesign either. Targeted repairs like that are usually done within one to three weeks, with the yard working round them.
And if the yard is due to be rebuilt within a year or two, a repair that keeps it draining until then can make more sense than new drainage the redevelopment would only dig up again.
A local track record
Postcode districts in Leeds and West Yorkshire where we've delivered: LS9, LS14, LS27, WF2, WF5, WF17.
Our Stourton yard flooded in 2015. Is it protected now?
Better than it was. In the Boxing Day 2015 floods, 40 businesses at Stourton between Thwaite Mills and the M1 were significantly affected, largely because of a breach of the river and canal at Knostrop, and a flood wall finished in 2018 now protects 88 businesses there, the council says. The survey then looks at whether the yard's own channels and outfalls can cope.
Does a channel repair on a Leeds yard trigger the runoff cut?
The cut in the council's flood standards is set for development, minor or major, so a like-for-like channel repair on a working yard doesn't usually bring it in; it comes into play when the yard is redeveloped. If a repair changes what drains where, check with the council before the work is designed.
Can attenuation or a separator go under a Leeds yard that has to stay open?
Yes, in sections. Storage tanks, oversized pipes or a separator go in under one area at a time, with the slab reinstated over each before the next is opened, so vehicles always have a way round. On a redeveloped Leeds yard, attenuation is often how the council's runoff cut is met, so the survey sizes it to that cut.
Can a Leeds yard drain to the river or a beck instead of the sewer?
The council's standards prefer it: reuse and infiltration come first, then attenuation in SuDS, a watercourse and a surface water sewer, with the combined sewer last. It still has to meet the council's runoff rules, and the outfall has to be somewhere the water can actually go, so the survey looks at what's nearby before the design picks a route.
Can a new run cross the busiest route on a Cross Green yard?
Yes, a section at a time. The run goes in across one part of the route while lorries use the rest, and the concrete over it is reinstated to the same or better standard before the next part is opened. On a large warehouse yard like those at Cross Green, the order is agreed with your site team first.
Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.
We use cookies to see how people use our site and to measure our adverts. They're on unless you choose Reject all. Privacy policy
Necessary
Needed for the site to work, such as remembering your cookie choice. They don't store anything that identifies you.
Always active
Analytics
Google Analytics and Microsoft Clarity show us how people use the site, such as which pages they visit and where they came from, so we can improve it.
Advertising
HubSpot, Google Ads and WhatConverts cookies measure how our adverts perform and connect an enquiry or phone call to the advert or page that led to it.