Concrete yard contractors in Leeds

Warehouse yards like those at Cross Green, and rail freight and aggregate yards like those at Stourton, carry HGVs, plant and containers. PKB Civils lays and repairs them as a specialist concrete yard contractor in Leeds, with our own crews and plant from Rochdale, in phases so vehicles keep moving, and prices each job after a free survey.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Concrete yards for Leeds distribution and manufacturing sites

Send your brief

Distribution and manufacturing yards like those at Cross Green and Stourton take HGVs, forklifts and plant all day, and the concrete wears out where those loads fall. We break out failed slabs, rebuild what's beneath them and lay new reinforced concrete with our own plant, a section at a time, so the site keeps working.

On the Aire Valley estates a yard is load-bearing kit for the business. Trailers stand at the same doors every day, plant turns on the spot where stock is moved, and each part of the yard needs a specification to match, which is why every job starts with a survey. For the full range, from a new yard to a single bay, see our concrete yard work.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Concrete yards in Leeds: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • New yards on estate plots

    Reinforced yards for distribution and manufacturing units at Cross Green and Stourton, specified for the trucks and plant that will use them.

    Send your brief
  • Relaying while the doors stay open

    Failed areas broken out and relaid in sections, so trailers keep reaching the loading doors while the next area is poured and cured.

    Send your brief
  • Entrances and turning areas

    Brushed, slip-resistant slabs where loaded HGVs swing in off busy estate roads and brake hardest.

    Send your brief
  • Joints placed for the traffic

    Saw-cut joints set out around the routes lorries and plant take across a Cross Green or Stourton yard.

    Send your brief
  • Yards for freight and aggregate

    Hardstanding for Stourton's rail-linked and mineral sites, built for the plant that works them as well as lorries.

    Send your brief
  • Bays rebuilt where patches failed

    Areas that keep failing cut out and rebuilt down to the sub-base, so a Leeds yard stops being patched over the same spot.

    Send your brief

Why Leeds sites choose us for concrete yards

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • Edge cracking traced to the ground

    A manufacturing site in Yorkshire on clay had cracking along one edge of its yard for three years, put down to vehicle damage and returned in the same place each year despite repairs. The survey found differential settlement from the clay shrinking in dry summers, and an edge beam with better drainage in that area stopped the cracking. The story is in our guide to weather-proofing a yard.

  • Doors kept open on big units

    On a large warehouse unit like those at Cross Green, the yard is split so a route to the loading doors stays open while each section is out, with the order agreed with your site team before work starts.

  • Placed and finished by our crew

    The concrete for a Leeds yard is ordered for the job, and the same PKB crew fixes the steel and pours it, so you aren't coordinating a delivery with a separate gang on a working site.

Is your Leeds yard holding you back?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

Where Leeds yards wear out first

The parts of a busy Leeds yard that take the most punishment, and what each one needs.

  • Aprons at the loading doors

    Trailer legs and axle groups land on the same spots at every door, trip after trip. On the big distribution units at Cross Green and Stourton, those aprons need a heavier specification than the rest of the yard.

  • Stocking bays at the aggregate plants

    At an aggregate plant like those at Stourton, a loading shovel's bucket scrapes the stocking bays and its wheels turn on the spot under load, so those bays need a harder-wearing slab than the lorry routes beside them.

  • Bays on waste and processing yards

    On a waste processing site like those at Cross Green, plant pushes loose material against bay walls and turns on the spot, and liquids get into any open joint. Bays and their aprons can wear out well before the rest of the slab.

  • Corners between big units

    Articulated lorries turning between large units load the same corners and slab edges on every turn, so on an estate like Cross Green those corners get extra thickness or reinforcement.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 3
Yard extension and retaining wall
Really impressed with your team and how you kept the yard open, the new works look fantastic. Brilliant job.
Yard extension and retaining wallBolton, Builders merchantsSee the job

What ground and site conditions should you expect in Leeds?

Along the Aire, river deposits lie over Coal Measures rock, and parts of the valley are former coal mining ground: groundworks in Leeds covers both. A slab on any of that is only as good as the sub-base under it, so the ground is investigated before the concrete is specified, with trial pits where the records are thin.

On top, Cross Green sits north of the Aire, with manufacturing, distribution and waste processing businesses in large industrial and warehouse buildings either side of the A63, the council's Aire Valley plan records. Stourton, between the river and the M1 and M621, is mostly manufacturing and distribution, including Arla's large dairy just off M1 junction 44, and aggregate comes in there by rail to mineral processing plants, according to the council's Natural Resources and Waste Local Plan. At an aggregate plant or a rail container yard like those at Stourton, loading shovels and container handlers work alongside the lorries, and a slab specified for vans won't last under them. Joint layout and thickness are set to where those loads fall, which the survey maps before anything is priced. On a yard that has settled before, the survey looks at why before anything is relaid.

When a new concrete yard isn't the right call

If the cracking comes from the ground moving, as it did on the Yorkshire clay site on this page, new slabs on the same ground will crack the same way. The cause gets dealt with first, before any concrete is priced.

If old workings under the yard are the worry, a new slab won't settle it on its own, however thick it is: groundworks in Leeds covers that ground.

And on a Stourton freight site where only the stocking bays have worn, those bays can be broken out and relaid on their own, without closing the lorry routes beside them or relaying a yard that's still sound.

A local track record

Postcode districts in Leeds and West Yorkshire where we've delivered: LS9, LS14, LS27, WF2, WF5, WF17.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about concrete yards in Leeds

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Our Leeds yard has one entrance. Can it be replaced without shutting us in?

Yes. An entrance that's the only way in and out is replaced in phases, so vehicles can always get through, and we agree the order with your site team before we start. The new slab is reinforced for constant HGV traffic, with a brushed, slip-resistant finish, which matters at estate gates off busy roads like the A63 at Cross Green.

Does old coal mining under the Aire Valley affect a concrete yard?

It can affect the ground the yard sits on. Parts of the Aire Valley are former coal mining ground, and a slab settling over an old void cracks however well it was laid, so the ground under a yard is investigated before the slab is specified. Groundworks in Leeds explains what has been recorded.

Does a Stourton freight or aggregate yard need a heavier slab?

Usually, where plant works on it. For HGV yards we typically start from 200mm of reinforced concrete on A252 mesh, and where loading shovels or container handlers work, as at aggregate plants and rail container yards like those at Stourton, we specify for their loads once the survey has shown what runs where. The ground under it can change the design too.

Why is the yard at a newer Aire Valley unit cracking already?

Often it isn't age. Ben's rule of thumb is that cracks caused by load run along predictable lines at the joints and slab edges, while cracks scattered across the middle of a bay point more often to frost or a moving sub-base. On Leeds ground, settlement over made ground or old workings can do it too, so the cause is found before anyone patches.

How many loading doors can stay open while a Cross Green yard is relaid?

As many as your site needs, within reason, and it's agreed with your site team before work starts. We split the yard into sections and relay one at a time, so the doors served by the other sections stay in use; the more doors that must work at once, the more sections the yard is split into, and you get a fixed programme first.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.