Enabling works contractors in Leeds

Aire Valley regeneration plots in Leeds come with old slabs, buried services and, on some, a coal mining legacy. PKB Civils deals with all of that as a specialist enabling works contractor, sending our own crews and plant from Rochdale to clear plots, break out old slabs and move services, so the main contractor starts on the date agreed.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Enabling works for Leeds development and regeneration sites

Send your brief

Developers, main contractors and occupiers bring us in when a Leeds plot has to be cleared and set up before anyone can build on it. We break out old slabs and bases, disconnect or move services, put in access and compounds, and hand the ground over at the right level, with our own crews and plant, typically acting as principal contractor for the enabling package.

The council's Aire Valley regeneration area runs south-east of the city centre: 1,300 hectares on both banks of the river, from the city centre to the M1. Our enabling works service sets out the full scope, and the survey of your plot is free.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Enabling works in Leeds: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Slabs, bases and footings out

    Old yards, machine bases and footings on former industrial plots broken out, with the arisings sorted for reuse on site or removal.

    Send your brief
  • Services disconnected or diverted

    Cables, pipes and old drains located and disconnected or rerouted before anyone digs, including runs that cross where the new building will stand.

    Send your brief
  • Access, haul roads and compounds

    Site access, haul roads and compounds laid out around what the plot allows, from a narrow bridge to a substation next door.

    Send your brief
  • Hoarding and traffic routes

    Secure hoarding and marked routes, so neighbouring units on a working estate keep trading while the plot next door is prepared.

    Send your brief
  • Redundant structures down

    Buildings, or the parts of them in the way, taken down to make room, with the rest of a live site kept running.

    Send your brief
  • Levels for the main contractor

    The cleared plot brought to the agreed level and handed over on the date the main contractor's programme needs it.

    Send your brief

Why Leeds sites choose us for enabling works

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • A live site, taken down in order

    At a steel manufacturer in Scunthorpe we took building sections down and got the ground ready for new piles while the site stayed live, as groundworks in Leeds tells in full.

  • Compounds placed once

    Ben leads our pre-construction planning, so the compound, haul road and stockpiles are placed once any mine entries are known.

  • Access sized before plant is booked

    Where a plot is served by a private bridge, as the former Skelton Grange site is, the plant and deliveries are planned around it before any start date is fixed.

  • Planned round a working site

    Where the plot is part of a site that's still operating, the clearance is timed around how your site runs and done in stages, so the rest of it keeps working while the ground is prepared.

Getting a Leeds site ready to build?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

What can hold up a Leeds plot

Constraints that can move a start date on Leeds development land, and where they're recorded.

  • Homes going up next door

    The Aire Valley plan aims for at least 6,500 new homes alongside its employment land, according to the council, so a commercial plot may sit beside housing going up, with hoarding, noise and deliveries planned for neighbours as well as the main contractor.

  • Floor levels near the Aire

    Near the river, the council's flood standards set a freeboard above the design flood level for industrial and warehouse development, which can fix the platform level before formation. See drainage in Leeds.

  • Old slabs nobody drew

    Over 400 hectares of the Aire Valley is mostly brownfield land, according to the council's plan, so a clearance can turn up old slabs, footings and services that no drawing shows, and the programme allows for them.

  • A charged street at the gate

    Where a plot's new access reaches a designated council street, the Leeds Lane Rental Scheme, approved in July 2026, can charge for works there at set days and times. See civil engineering in Leeds.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 3
New concrete yard
The guys have been brilliant from start to finish... Thanks again to all the team and really appreciate the work you have done for us. Who knows you may end up at another AVK site in the future...
New concrete yardHyde, Manufacturing, 6 weeksSee the job

What ground and site conditions should you expect in Leeds?

The Leeds City Region Enterprise Zone in the Aire Valley has its development land on four sites either side of the East Leeds Link Road: Newmarket Lane, Thornes Farm, Logic Leeds and Temple Green, the largest, the council's plan records. A plot on any of them still needs its own access, compound and service connections before a building goes up, and the main contractor will expect them in place on day one of their programme.

On Aire Valley sites, any mine shaft entries the Coal Mining Risk Assessment identifies have to be made safe, with nothing built over an entry or within its zone of influence, under the same plan. So the mine entries are found before anything is set out, and we keep the compound and stockpiles off their zones.

Some plots bring their own constraints. The former Skelton Grange power station site is served by a private single-carriageway bridge and sits next to a large National Grid switching substation serving a large area of the city, the plan records. On a plot beside a substation like that, the service searches come before anyone breaks ground, and cable routes are confirmed with the network owner before the first excavator arrives.

When enabling works isn't the right call

Housing plots aren't ours. Our work is commercial and industrial sites, so where the Aire Valley and South Bank plans bring new homes, another firm is the one to call, and the employment land is where we come in.

Nor do we fit renewable systems. Where solar panels or chargers are planned, we get the ground ready and put ducts in while it's open, as our guide to getting a yard ready for a renewable installation explains, and the installer takes it from there.

And if your plot is already clear, level and free of services, it may need a dig more than enabling works: earthworks in Leeds covers that.

A local track record

Postcode districts in Leeds and West Yorkshire where we've delivered: LS9, LS14, LS27, WF2, WF5, WF17.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about enabling works in Leeds

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Can you prepare an Enterprise Zone plot in the Aire Valley for a main contractor?

Yes: we clear it, take out old slabs and bases, deal with live services and set up access and compounds, then hand over at the level and date the main contractor's programme needs. The zone was still being developed out in 2023, a combined authority report said, so a plot there may have neighbours already trading, and hoarding and traffic routes come first.

What does the Aire Valley Leeds Area Action Plan mean for a plot we're clearing?

It sets what the land is for. The plan aims for at least 250 hectares of employment land across the valley as well as new homes, and the clearance has to suit the use your plot is allocated for. Check the allocation, and any conditions on the planning permission, before the enabling works are designed.

What should be in place before enabling works start on a Leeds plot?

Any Coal Authority permit the plot needs, the service records so live services can be traced, and agreement on access onto the plot. The coal checks that come before all of that are set out in groundworks in Leeds. With those in hand, the survey can turn into a programme with a start date that holds.

Can clearance start on an Aire Valley plot before a mine entry is treated?

Usually on the rest of the plot: capping or filling an entry needs a Coal Authority permit, and isn't scheduled until the certificate is issued. So the clearance is phased, with the parts of the plot away from the entry and its zone going first and the work near it following once the treatment is done.

Will you take on a commercial plot in Leeds' South Bank?

Yes, for commercial and employment space. The South Bank framework, adopted in August 2018, aims to double the size and economic impact of the city centre with 35,000 new jobs, the council says, and our part is the commercial plots. City centre sites usually mean tighter access and hoarding beside live streets, so the survey looks hard at deliveries before a start date is set.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.

Got a yard that's holding you back?

Tell us what's happening on site. We'll review your brief and, if it's a good fit, arrange a free site survey.