Concrete yard contractors in Glasgow

PKB Civils is a specialist concrete yard contractor for port, logistics and industrial sites in Glasgow and North Lanarkshire, laying new reinforced slabs and replacing failing ones a section at a time. The crews and plant are our own, from Rochdale, and vehicles keep moving through the rest of the yard while each section is done.

  • Keeping Clients Operational
  • Works Phased Around Your Site
  • Our Own Crews and Plant
  • Principal Contractor

Concrete yards for Glasgow's port, logistics and industrial sites

Send your brief

For managers of Glasgow yards that carry HGVs, forklifts and heavy plant every day and are starting to break up under them. We lay and repair the yard itself with our own crews and plant: sub-base, reinforcement, pour, finish and saw-cut joints. What we build is listed under our concrete yard work.

On the Clyde, Peel Ports calls King George V Dock the main river port serving Glasgow and the region, and after a record 2024 handling wind turbine components it built a new road to take oversized cargo out to the main roads. Inland, North Lanarkshire Council reports that its area holds 58% of all marketable land in the Glasgow City Region.

2,000+Projects completed across the UK
150,000m²Concrete poured across all our jobs
40yearsFamily-run in Rochdale since 1986

Concrete yards in Glasgow: what we do

Everything we can take on for you. Not sure which you need? Send your brief and we will tell you.

  • Laydown and staging areas

    Hardstanding for heavy cargo and stacked materials that sit in one place for weeks, with the slab and joints designed for the heaviest item stored on it.

    Send your brief
  • Logistics yards in Lanarkshire

    Trailer parks, service yards and turning areas for distribution sheds around Eurocentral, where every lorry turns on the same few metres of slab.

    Send your brief
  • Bays relaid section by section

    Failing bays cut out and replaced in turn, so traffic keeps using the rest of the yard until each new bay can take load.

    Send your brief
  • Joints and falls put right

    Failed joints rebuilt and falls corrected so rain runs to the channels and stays out of the sub-base.

    Send your brief

Why Glasgow sites choose us for concrete yards

The same people survey, plan and build your job, and your site keeps running while we do it.

Send your brief
  • The Glasgow yard in full

    Failing concrete and drainage were causing operational and health and safety problems on a large Glasgow yard, spread over several areas, and the site had to keep operating throughout. Over 12 weeks we laid 2,400m² of new concrete, repaired slabs across several more areas and repaired or replaced its gullies and channels. Each work area was sectioned off from vehicles and people before we started in it. When on-site issues called for design changes on the fly, the client's project manager gave us credit for how we handled them. The client had worked with us before, and the yard came out more usable and measurably safer.

  • Forms, steel and pour by one crew

    In Ben's words, “PKB Civils handles formwork, steel fixing, and concrete pouring with the same in-house team on every project. Nothing is subcontracted out at the critical stages.” On a Glasgow job, the people who set the forms answer for the finish. His reasoning is in his article on formwork.

  • Phased around your traffic

    Before a Glasgow pour, access routes, phase boundaries and working hours are agreed with your site management, so vehicles keep using the yard around the section being laid.

Is your Glasgow yard holding you back?

Send us a short brief and a few photos. If it's a good fit, we'll arrange a free site survey and plan the work around how your site runs.

Send your brief

Where Glasgow yards give out first

What we look at first on a port, logistics or industrial yard around Glasgow, and why it fails there.

  • Cracks that wander

    Cracks from load usually follow joints and slab edges. Random cracking across a slab, in Ben's experience, points more often to frost or a moving sub-base, so on a Glasgow yard the survey looks underneath before a thicker slab is priced.

  • No room to grow

    Industrial space in North Lanarkshire is tight: availability of 3.25% against a city region average reported at 4.3%, the council says. Getting more from your own land, as a Bolton manufacturer did by turning unused ground behind its warehouse into yard, can beat moving.

  • Mixers in the city centre

    Concrete mixers are HGVs, so on a job inside Glasgow's Low Emission Zone every wagon has to meet Euro VI: see civil engineering in Glasgow.

  • A planning shortcut that has ended

    Hillington Park's Simplified Planning Zone, which removed the need for individual planning applications for certain development, came to an end in October 2024, Glasgow City Council says. New development on the park is back on the usual planning route, so allow for it in the programme.

What our clients say

Feedback from the people who run these sites, shown with the job we did for them.

1 / 2
Concrete repairs
The fact you have a road sweeper coming on-site to clean up, is very much appreciated and shows attention to detail. Your team always work clean and tidy, and what really stood out is their communication and the fact nothing is too much trouble. The concrete repairs exceeded my expectations and should make the area much safer to work in.
Concrete repairsRochdale, Manufacturing, 4 to 5 weeksSee the job

What ground and site conditions should you expect in Glasgow?

King George V Docks is a solid concrete wharf with a quayside safe working load of 400 tonnes, according to Peel Ports' berth data sheet, and next door the Shieldhall riverside berth takes bulk cargo such as animal feed and project cargo such as turbine blades, Peel Ports says. That rating belongs to the wharf. The yards behind a quay take the plant and trailers that move cargo on and off it, and those are the loads their slabs are designed for.

Stacked cargo is the other load to plan for. Peel Ports lists 266,000 square metres of laydown at King George V for staging wind turbine components, and a slab under stacked components is designed for the heaviest item stored on it, with joints set out around the stacks and the routes between them.

Inland, the distribution parks wear a yard differently: lorries swinging round in the same place all shift, trailers parked on their landing legs and forklifts working the loading bays, all of which find the joints and edges first.

Under the slab, ground around Glasgow runs from glacial till to soft raised marine clay and old made ground, covered on groundworks in Glasgow. So the subgrade is tested, and the sub-base designed with the slab, before its thickness is fixed.

When new concrete isn't the right call

A tired yard doesn't always need new concrete. If the slab is sound and the trouble is a few joints or a broken corner, filling and local repair is money better spent, and it involves no new formwork. Ben's caution is that each patch leaves a fresh edge where the next break tends to begin, so repairs pay only while they stay few.

If rain lies on the yard for hours, look at the drainage before anyone prices a slab. Ben's view is that water does more early damage to yard concrete than the weight of the traffic, so the channels and gullies come first: see drainage in Glasgow.

A local track record

Postcode districts in Glasgow and Lanarkshire where we've delivered: G51, ML4.

See them on the map
2,000+Projects completed across the UK
1986The year PKB started in Rochdale

Questions about concrete yards in Glasgow

Can't see your question? Call us or send your brief and we'll come back to you.

Send your brief
Should we call a ready-mix plant or a yard contractor about a failing Glasgow yard?

It depends who will do the work. A ready-mix plant delivers concrete for a team that will place it. If you need the whole yard dealt with, from the survey and break-out to the sub-base, steel, pour and saw-cut joints, that's the work our own crews do, and the free site survey is where we decide which bays need replacing and which can be repaired.

Where are new logistics sheds going up around Glasgow?

North Lanarkshire is one place. The council says a US-backed deal will create 355,000 sq ft of industrial and logistics premises on a 40-acre site at Orchard Park, Eurocentral, and that Bellshill's Big Blue Shed, on a six-acre site, is being refurbished. Sheds like those need yards, trailer parks and turning areas built for the traffic they'll see.

Does a concrete pump on a Glasgow street need a council permit?

Yes, if it stands on the road. Glasgow City Council includes concrete pumps and access platforms in its crane permit for building operations, charged per day for the first 7 days and per week or part week after that, so the permit has to cover the whole time the pump is out. Where the pump and wagons can stand inside your boundary, no road permit is needed for them, so it's worth checking at the survey whether they'll fit.

How thick should a yard slab be for HGVs and port plant in Glasgow?

For yards taking HGVs and heavy plant we typically specify at least 200mm of reinforced concrete on A252 mesh, as our guide to port yard maintenance explains. Where port plant works or cargo is stacked, the slab may need to be deeper or more heavily reinforced. The final design follows the vehicle weights, how the yard is used and the ground under it.

Do you lay concrete yards in Renfrewshire as well as Glasgow?

Yes. Hillington Park, for one, straddles the boundary: Glasgow City Council describes it as one of Scotland's largest business parks, south of the M8 between Glasgow and Paisley, with about 80% of the site in Renfrewshire and 20% in Glasgow. Our crews and plant travel from Rochdale either way, and the survey settles which council's permits a pour will need.

Ben Duffy

Written by Ben Duffy

Director, PKB Civils. Page reviewed

Ben has over 10 years of experience in contracting management, specialising in pre-construction with some of the UK's largest contractors. Ben now leads pre-construction, project planning and client engagement.